|
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />
<br />KEY PERSONNELRESUME ~
<br />A&P CONSULTING TRANSPORTATION ENGINEERS ~
<br />
<br />. YULET MIGUEL, E.!. PAGE 2/2
<br />
<br />Signing adn Pavement Marking
<br />
<br />SW 192 STREET FROM SW 197 AVENUE TO SW 177 AVENUE,
<br />MIAMI, FLORIDA
<br />Client: Miami-Dade County FDOT FPID No,: 425457-1 (Barrera,
<br />Jose, 305-470-5260). The project encompasses the widening and
<br />resurfacing of the existing roadway. The scope includes the
<br />preparation of roadway plans, addition of shoulders, pavement
<br />markings, and advanced warning signs. Mrs. Miguel assisted in the
<br />preparation of roadway plans and signing and pavement markings
<br />plans.
<br />
<br />,
<br />J
<br />
<br />ARRA DESIGN-BUILD, MIAMI LAKES, FLORIDA
<br />Client: Town of Miami Lakes. Reference: Felix Acosta; (305) 556-
<br />0473; Length of Corridor: 0.4 miles; Project Duration: 4/2010 -
<br />2/2011 The Florida Department of Transportation (FDOT) along with
<br />the American Recovery and Reinvestment Act of 2009 (ARRA) are
<br />performing roadway and drainage improvements on the existing
<br />roadway. The project scope encompasses the preparation of
<br />drainage plans, the preparation of roadway plans, the preparation
<br />of signing and pavement marking plans and Maintenance ofTraffic
<br />(MOT) plans. Mrs. Miguel assisted in the preparation of roadway
<br />plans.
<br />
<br />J
<br />
<br />SR-809/ MILITARY TRAIL, PALM BEACH, FLORIDA
<br />Client: FDOT District 4 (Thuc Le, P.E. (954) 777-4552). The project
<br />consists of preparation of a Contract Plans Set for the milling &
<br />resurfacing of a 3.6 miles of the existing roadway. The basic
<br />services provided with the scope of services include the preparation
<br />of the RRR Report, the preparation of design exceptions/variations,
<br />utility coordination, local government coordination, public
<br />involvement, preparation of roadway plans, preparation of signing
<br />& pavement markings plans, preparation of signalization plans,
<br />preparation of the Specifications Package, preparation of the
<br />electronic delivery of the plans & specifications, and
<br />update/maintenance of the cost estimate. Mrs. Miguel assisted in
<br />the preparation of the roadway plans for this project.
<br />
<br />SOUTH POINTE - ROW IMPROVEMENT PROJECT (PHASES
<br />III, IV AND V), CITY OF MIAMI BEACH, FLORIDA
<br />
<br />Client: City of Miami Beach (Carla Dixon, Project Manager (305)
<br />673-7071). The project encompasses approximately 19,000 LF of
<br />ROW infrastructure improvements including roadway plans,
<br />streetscape enhancements, water main replacements, drainage
<br />improvements, landscaping and lighting improvements, and
<br />roadway reconstruction. Due to the existing mixed residential and
<br />commercial environment of this neighborhood, special design
<br />efforts were made to incorporate a walkable community elements
<br />meeting all ADA requirements. Mrs. Miguel performed numerous
<br />site visits for the preparation of roadway plans, signing and
<br />pavement markings, paving, and drainage plans. She assisted in
<br />the roadway design, plans preparation, and signing inventory of
<br />the project. She also performed utility coordination contacts and
<br />utility re-Iocation plans.
<br />
<br />CITY CENTER - ROW IMPROVEMENT PROJECT, CITY OF
<br />MIAMI BEACH, FLORIDA
<br />Client: City of Miami Beach, Florida (Keith Mizell Project Manager
<br />(305) 673-7071). The project encompasses approximately 24,000
<br />LF of ROW infrastructure improvements including roadway
<br />reconstruction, streetscape enhancements, water main
<br />replacements, sanitary sewer upgrades, stormwater drainage
<br />improvements, landscaping improvements, and lighting
<br />improvements. Due to the existing mixed residential and
<br />commercial environment of this neighborhood, special design
<br />efforts were made to incorporate walkable community elements
<br />meeting all ADA requirements. Mrs. Miguel assisted in the plans
<br />preparation and engineering design of hardscape, landscape,
<br />pavement markings, Paving, drainage, and utilities. She also
<br />performed daily entries of work progress on company based
<br />program used for managing and storing projects.
<br />
<br />SUNSET ISLANDS 1 & 2, CITY OF MIAMI BEACH, FLORIDA
<br />Client: City of Miami Beach, Florida (Keith Mizell Project Manager
<br />(305) 673-7071). Project consisted of the design of roadway
<br />improvements stormwater, and water main design for the City of
<br />Miami Beach. Mrs. Miguel took part in the design of drainage and
<br />grading in the project area, as well as calculations for the drainage
<br />report and identification of the drainage areas.
<br />
<br />
<br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS .
<br />
|