Laserfiche WebLink
) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />} <br />) <br />) <br />, <br />) <br />) <br />) <br />) <br />) <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. MILDRED PADERNI PAGE 2/2 <br /> <br />Signing adn Pavement Marking <br /> <br />Management <br /> <br />ARRA PROJECT - INDIAN CREEK DRIVE FROM ABBOT AVE. <br />TO 71 ST STREET <br />Client: Client: City of Miami Beach (Xavier Falconi, P,E., P.M. (305) <br />673-7071 ).Engineer Technician for the milling and resurfacing, <br />safety improvements, ADA compliance, new pavement marking, <br />signage, new bike lanes, and a new signal at 69th Street. <br />Responsible of obtaining all local permits and utility coordination. <br /> <br />ARRA PROJECT MIAMI LAKEWAY NORTH RESURFACING <br />AND DRAINAGE IMPROVEMENTS <br />Client: Town of Miami Lakes (Gary R. Ratay, P.E., Project Manager <br />(954) 535-5100).Engineer Technician responsible for the Design- <br />Build ARRA Project of Miami Lakeway North and NW 153rd Street. <br />Project includes the Milling & Resurfacing of 0.6 miles of the <br />existing roadway, Signing, Pavement Markings and new drainage <br />improvements, including new French Drains, inlets, manholes and <br />the design of a 30-inch outfall. Responsible for the Utility <br />Coordination and obtaining local permits (DERM, SFWMD, and <br />Miami-Dade County Public Works). <br /> <br />WASHINGTON AVENUE IMPROVEMENTS PHASES II, IV & V - <br />MIAMI-DADE COUNTY, FLORIDA <br />Client: City of Miami Beach (Charles Carreno, P.E" Project <br />Manager (305) 532-9292). Prepare construction documents (plans <br />and specifications) for the following improvements: milling & <br />resurfacing, new gravity drainage wells, sanitary sewer capacity <br />improvements which consist of pipe/manhole up-sizing, water main <br />upgrades, relocation of water meters/meter boxes, new decorative <br />lighting system, landscape and irrigation upgrades, replacement of <br />curb & gutter and sidewalk from 11th St. to 16th St., design of <br />intersection bumps-outs, compliance with ADA requirements, <br />modification of parking space layout, relocation of existing utilities, <br /> <br />coordination with the CMB Parking Department to remove and <br />reinstall parking meter heads and parking signs, & signature <br />median improvements from 5th St. to 6th St., between 16th to <br />Lincoln Rd. and along Lincoln Rd from Washington Ave to Collins <br />Ave. Also responsible for the office administration construction <br />progress activities related to the construction of this right-of-way <br />improvement project. <br /> <br />N.W. 37TH AVENUE - MIAMI-DADE COUNTY, FLORIDA <br />Client: Miami-Dade County Public Works Department (Raul <br />Quintela, P.E., Project Manager (305) 375-3971). Prepare a <br />Contract Plans Set for the total reconstruction of a 2.72 mi segment <br />of this urban/commercial corridor. Including new drainage, lighting <br />design and compliance with ADA requirements, with the following <br />included: Traffic Control, Maintenance of access for pedestrians to <br />businesses or residences, Underground utility construction, Erosion <br />control and storm water pollution prevention measures, Drainage <br />collection and/or disposal system. <br /> <br />BISCAYNE BOULEVARD MIAMI-DADE COUNTY, FLORIDA <br />Client: City of Miami, Miami, FI (Kevin A. Brown, P.E, Project <br />Manager (305) 416-1090). Prepare Construction Documents (plans <br />and specifications) for the reconstruction of SR-5 / Biscayne <br />Boulevard from NE 14th Street to NE 15th Street. The project <br />included Milling, Resurfacing and Streetscape improvements of the <br />street surrounding the new Performance Art Center (PAC) which <br />is being referred as the "Super Block" and bounded by NE 13th <br />Street to the south, NE 15th Street to the north, Bayshore Drive to <br />the east and NE 2nd Avenue to the west, City of Miami, Miami- <br />Dade County. The project also included hardscape limited to street <br />furniture, sidewalk, signing and pavement markings, lighting, utility <br />coordination, landscaping, cost estimates, and all necessary <br />incidental items for a complete project. <br /> <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />