|
<br />
<br />j
<br />)
<br />
<br />ACADEMIC
<br />BACKGROUND
<br />B.S., Engineering
<br />Technology, University of
<br />Central Florida, 2008
<br />
<br />PROFESSIONAL
<br />REGISTRATION
<br />Registered Professional
<br />Surveyor & Mapper,
<br />FL #LS6769
<br />
<br />PROFESSIONAL
<br />CERTIFICATIONS
<br />CSX Safety Facilitator
<br />
<br />OSHA 30
<br />
<br />First Aid
<br />
<br />Monitoring of Traffic Safety
<br />
<br />Fall Protection Training
<br />
<br />Mr. Hoyle is a Survey Crew Supervisor with over I 0 year~, experience throughout the state
<br />of Florida. He is a graduate from the University of Central Florida Engineering Technology
<br />Program. His experience includes ACSM/ALTA surveys, boundary, construction layout,
<br />topographic surveys and As-built surveys. Mr. Hoyle has experience in today's newest software
<br />including AutoCAD,TDS collection,Topcon and Trimble GPS.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />AMERICAN TOWER, VERIZON, AT&T, NEXTEL, SPRINT, O.P.M., DATA LINK,
<br />FL: Provided boundary and topographic surveys on existing and proposed tower sites on
<br />over 150 government sites.
<br />
<br />CELEBRATION, ORLANDO, FL: Served as Crew Chief, duties included calculating and
<br />layout of residential construction. Tasks included lot and house layout, foundations and final
<br />as-built.
<br />
<br />AVALON PARK, ORLANDO, FL: Served as Crew Chief, duties included calculating and
<br />layout of residential construction. Tasks included lot and house layout, foundations and final
<br />as-built.
<br />
<br />BALDWIN PARK, ORLANDO, FL: Served as Crew Chief, duties included calculating and
<br />layout of residential construction. Task included lot and house layout, foundations and final
<br />as-built.
<br />
<br />COMMERCE PARK, ORLANDO, FL: Served as Crew Chief, duties included calculating
<br />and layout of all construction. Tasks included layout and as-built of building, roads, drainage
<br />and utilities.
<br />
<br />ORLANDO ROCK, CENTRAL FL: Served as Crew Chief, duties included calculating and
<br />layout of all construction. Tasks included layout and as-built of building, roads, drainage and
<br />utilities.
<br />
<br />WINDERMERE PREP SCHOOL, WINDERMERE, FL: Served as Crew Chief, duties
<br />included calculating and layout of all construction.Tasks included layout and as-built of building,
<br />roads, drainage utilities and Olympic regulation track and field courses and pools.
<br />
<br />b.....:..II."".-~~i-..;'":-~""'..,.~
<br />
<br />- ,
<br />~..
<br />:::~;,~~ KEITH and SCHNARS, P.A.
<br />:l :::;.~. J FLORlOAs Bj!-lDCAL FIRM
<br />-=---
<br />
<br />RFP #11-11-02
<br />
<br />PAGE 27
<br />
|