Laserfiche WebLink
<br />r <br /> <br /> <br />ACADEMIC <br />BACKGROUND <br />M.S., Environmental <br />Engineering, Florida <br />International University, <br />1995 <br /> <br />B.S., Civil Engineering, <br />Florida International <br />University, 1992 <br /> <br />A.A., Miami-Dade College, <br />/988 <br /> <br />PROFESSIONAL <br />REGISTRATIONS <br />Registered Professional <br />Engineer, FL #55459 <br /> <br />-- <br /> <br />~~%~1~ KEITH and S.CHNARS, P.A. <br />~ :::i::.f. FLORlDAs &9"!DeAL FIRM <br />~ <br /> <br />(" <br />(" <br />(' <br />( <br /> <br />Mr. Vilar has over 14 yea,:s of extensive professional experience in the design of water/w(l,~tewater <br />systems, design of drainage and storm water management systems, site design and development, <br />preparation of contract documents and specifications for bid and permitting services experience <br />through numerous South' Florida agencies. His experience includes design of water and wastewater <br />improvements for the City of Fort Lauderdale, rehabilitation of lift stations in Cities of Coconut <br />Creek and North Lauderdale, and neighborhood improvements for the Westgate CRA. Professional <br />experience also includes work on various land development projects for Seminole Tribe of Florida, <br />Coscan Homes and also administering the NPDES Program for the City of Miami. <br /> <br />RELEVANT EXPERIENCE <br /> <br />FIRST SEMINOLE INDIAN BAPTIST CHURCH ADDITIONAL PARKING, FORT <br />LAUDERDALE, FL: The project scope for the 25-acre site development included parking lot <br />improvements/expansions, and water mains for fire protection. In addition, the stormwater management <br />system was expanded and consisted of swales and exfiltration trench to provide pre-treatment, water <br />quality and flood control for the improved site prior to discharging through a control structure into <br />the existing FDOTTurnpike Canal adjacent to the site. Drainage Calculations were performed to meet <br />SFWMD, CBWD criteria and also FDOT. An FDOT Critical Storm Duration Analysis was performed <br />on 32 storm events in order to obtain the Drainage Connection Permit from FDOT. Responsibilities <br />included design of the site plan, water mains for fire protection, paving, grading, and drainage, pavement <br />marking and signage, and permitting. <br /> <br />WESTGATE CRA NORTH INFRASTRUCTURE IMPROVEMENTS PHASES IV, V. AND VI, <br />WEST PALM BEACH, FL: The proposed improvements included design and permitting services <br />for the construction of the last three phases of a six phase 140-acre site for the Westgate Community <br />Redevelopment Agency and located in West Palm Beach. The improvements involved paving, grading <br />and drainage, water main and sanitary sewer improvements within this existing subdivision comprised <br />of mainly residential and commercial properties. Responsibilities included the design of water, sewer, <br />drainage, roadway, and pavement marking and signage. Permitting, bidding and negotiating and cost <br />estimating services were also provided. Client/ContactWestgate CRA/Elizee Michel, Phone: (561) 233-3626. <br />(9/08 to 4/1 0) <br /> <br />WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST, <br />SUNSET NORTH, RIVER RUN, FLAMINGO PARK, OAK RIVER, SHADY BANKS AND <br />EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for the design of <br />water and wastewater improvements for the City of Fort Lauderdale WaterWorks 20 II Program.The <br />service areas for these projects are comprised of a mixture of single family, multi-family, commercial, <br />office and industrial uses. The design phase includes over 188,000 linear feet of gravity sewer, 20,300 <br />linear feet of force mains, 16 new wastewater pump stations, and 43,000 linear feet of water mains. The <br />total construction value was estimated to be 30 million dollars. Client/Contact City of Fort Lauderdale/ <br />Paul Bohlander, P.E., Phone: (954) 522-2604. (1/03 to 6/09) <br /> <br />SEWER STUDY FOR CHULA VISTA/RIVER LANDS/LAUDERDALE ISLE AND RIVER <br />LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering <br />study to provide sanitary sewer systems to several residential communities which are being serviced <br />by individual septic tank systems and recently annexed by the City of Fort Lauderdale. The study <br />area comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated <br />several options to service the subject communities. The recommended wastewater system includes <br />55,000 linear feet of gravity sanitary sewer collection systems, 7,000 linear feet of force mains and <br />three (3) wastewater pump stations. The total construction value was estimated to be $10 million. <br />Client/Contact City of Fort Lauderdale/Paul Bohlander, P.E., Phone: (954) 522-2604. (4/03 to 10/03) <br /> <br />ARDEN PARK, HOLLYWOOD, FL: Redevelopment of a former 33-acre mobile home park into <br />a 153 unit residential development in Hollywood.The design and permitting was done in three phases: <br />I. demolition phase involved removal of the mobile homes and existing utilities within the site, and <br />capping the existing utilities at the right of way. 2. Lake Improvements Phase involved the partial filling <br />of two existing lakes and sizing / designing the two proposed lakes that would ultimately serve as the <br />sites storm water management system. 3. Residential Development phase was the master design <br />of the potable water, sanitary sewer, paving, grading and drainage, pavement marking & signage and <br />roadway design for the proposed 153 unit development. <br /> <br />'~,~~~.......~- <br /> <br />PAGE 30 <br /> <br />RFP#11-11-02 <br />