|
<br />r
<br />
<br />
<br />ACADEMIC
<br />BACKGROUND
<br />M.S., Environmental
<br />Engineering, Florida
<br />International University,
<br />1995
<br />
<br />B.S., Civil Engineering,
<br />Florida International
<br />University, 1992
<br />
<br />A.A., Miami-Dade College,
<br />/988
<br />
<br />PROFESSIONAL
<br />REGISTRATIONS
<br />Registered Professional
<br />Engineer, FL #55459
<br />
<br />--
<br />
<br />~~%~1~ KEITH and S.CHNARS, P.A.
<br />~ :::i::.f. FLORlDAs &9"!DeAL FIRM
<br />~
<br />
<br />("
<br />("
<br />('
<br />(
<br />
<br />Mr. Vilar has over 14 yea,:s of extensive professional experience in the design of water/w(l,~tewater
<br />systems, design of drainage and storm water management systems, site design and development,
<br />preparation of contract documents and specifications for bid and permitting services experience
<br />through numerous South' Florida agencies. His experience includes design of water and wastewater
<br />improvements for the City of Fort Lauderdale, rehabilitation of lift stations in Cities of Coconut
<br />Creek and North Lauderdale, and neighborhood improvements for the Westgate CRA. Professional
<br />experience also includes work on various land development projects for Seminole Tribe of Florida,
<br />Coscan Homes and also administering the NPDES Program for the City of Miami.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />FIRST SEMINOLE INDIAN BAPTIST CHURCH ADDITIONAL PARKING, FORT
<br />LAUDERDALE, FL: The project scope for the 25-acre site development included parking lot
<br />improvements/expansions, and water mains for fire protection. In addition, the stormwater management
<br />system was expanded and consisted of swales and exfiltration trench to provide pre-treatment, water
<br />quality and flood control for the improved site prior to discharging through a control structure into
<br />the existing FDOTTurnpike Canal adjacent to the site. Drainage Calculations were performed to meet
<br />SFWMD, CBWD criteria and also FDOT. An FDOT Critical Storm Duration Analysis was performed
<br />on 32 storm events in order to obtain the Drainage Connection Permit from FDOT. Responsibilities
<br />included design of the site plan, water mains for fire protection, paving, grading, and drainage, pavement
<br />marking and signage, and permitting.
<br />
<br />WESTGATE CRA NORTH INFRASTRUCTURE IMPROVEMENTS PHASES IV, V. AND VI,
<br />WEST PALM BEACH, FL: The proposed improvements included design and permitting services
<br />for the construction of the last three phases of a six phase 140-acre site for the Westgate Community
<br />Redevelopment Agency and located in West Palm Beach. The improvements involved paving, grading
<br />and drainage, water main and sanitary sewer improvements within this existing subdivision comprised
<br />of mainly residential and commercial properties. Responsibilities included the design of water, sewer,
<br />drainage, roadway, and pavement marking and signage. Permitting, bidding and negotiating and cost
<br />estimating services were also provided. Client/ContactWestgate CRA/Elizee Michel, Phone: (561) 233-3626.
<br />(9/08 to 4/1 0)
<br />
<br />WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST,
<br />SUNSET NORTH, RIVER RUN, FLAMINGO PARK, OAK RIVER, SHADY BANKS AND
<br />EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for the design of
<br />water and wastewater improvements for the City of Fort Lauderdale WaterWorks 20 II Program.The
<br />service areas for these projects are comprised of a mixture of single family, multi-family, commercial,
<br />office and industrial uses. The design phase includes over 188,000 linear feet of gravity sewer, 20,300
<br />linear feet of force mains, 16 new wastewater pump stations, and 43,000 linear feet of water mains. The
<br />total construction value was estimated to be 30 million dollars. Client/Contact City of Fort Lauderdale/
<br />Paul Bohlander, P.E., Phone: (954) 522-2604. (1/03 to 6/09)
<br />
<br />SEWER STUDY FOR CHULA VISTA/RIVER LANDS/LAUDERDALE ISLE AND RIVER
<br />LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering
<br />study to provide sanitary sewer systems to several residential communities which are being serviced
<br />by individual septic tank systems and recently annexed by the City of Fort Lauderdale. The study
<br />area comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated
<br />several options to service the subject communities. The recommended wastewater system includes
<br />55,000 linear feet of gravity sanitary sewer collection systems, 7,000 linear feet of force mains and
<br />three (3) wastewater pump stations. The total construction value was estimated to be $10 million.
<br />Client/Contact City of Fort Lauderdale/Paul Bohlander, P.E., Phone: (954) 522-2604. (4/03 to 10/03)
<br />
<br />ARDEN PARK, HOLLYWOOD, FL: Redevelopment of a former 33-acre mobile home park into
<br />a 153 unit residential development in Hollywood.The design and permitting was done in three phases:
<br />I. demolition phase involved removal of the mobile homes and existing utilities within the site, and
<br />capping the existing utilities at the right of way. 2. Lake Improvements Phase involved the partial filling
<br />of two existing lakes and sizing / designing the two proposed lakes that would ultimately serve as the
<br />sites storm water management system. 3. Residential Development phase was the master design
<br />of the potable water, sanitary sewer, paving, grading and drainage, pavement marking & signage and
<br />roadway design for the proposed 153 unit development.
<br />
<br />'~,~~~.......~-
<br />
<br />PAGE 30
<br />
<br />RFP#11-11-02
<br />
|