Laserfiche WebLink
<br />!(.M.E.C <br /> <br />t" 11 g 1 11 to (' J ~ <br /> <br /> <br />Professional Credentials <br /> <br />More than 20 years experience <br />in transportation planning, <br />policy, finance, highway and <br />utilities design, construction <br />engineering, inspection, <br />management, and government <br />relations. <br /> <br />Office Location: Sunny Isles <br />Beach <br /> <br />Registration: 1991 Florida <br />Professional Engineer No, <br />44065 <br /> <br />Education: <br />Bachelors of Science - Civil <br />Engineering, 1986, University <br />of Miami, Miami, Florida <br /> <br />Experience: President, <br />Quality Control Manager <br />August. 2005 - Present <br />K.M, Engineering Consultants, <br />Inc, <br /> <br />Program Manager <br />Jan 1993 - June 2005 <br />Miami Intermodal Center <br />Program <br />FDOT - District VI, Miami <br /> <br />Program Manager <br />Jan 1993 - June 1998 <br />East-West Multimodal Corridor <br />Study <br />FDOT - District VI, Miami <br /> <br />) <br />n <br />n <br />n <br />n <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Kouroche Mohandes, P.E. <br />K.M. Engineering Consultants, Inc. <br /> <br />General Experience: <br /> <br />Mr. Mohandes has 20 years of diverse transportation planning, policy, <br />finance, design of highways and utilities, and construction engineering, <br />inspection and management experience. While employed with the Florida <br />Department of Transportation (FDOT) District VI in Miami, Mr. Mohandes <br />gained significant government relations experience transcending all modes of <br />transportation and levels of government. Since 2005, Mr. Mohandes has <br />been self-employed as an engineering consultant, specializing in major <br />project management and facilitation, and government relations. <br /> <br />Miami-Dade County WASD Government Cut/Fisherman's Channel <br />Utility Relocation Projects, Miami, Florida (May 2011 to Ongoing) <br />Contract Administration and Construction Management for the 54" Force <br />Main relocation underneath Government Cut Channel between Fisher <br />Island and South of the City of Miami Beach and the 20" Water Main <br />relocation underneath Fisherman's Channel between Port Island and <br />Fisher Island as developed through consultation with Miami-Dade Water <br />and Sewer Department (MDWASD). The scope of services include, but <br />are not limited to contract administration, construction management, and <br />field inspection services that will include but are limited to; engineering <br />and construction administration activities during the design, permitting, <br />and construction phases of the design-build contracts, daily on-site <br />inspections, maintaining daily progress logs, coordinate weekly status <br />meetings, review and approve schedules, schedule of values, and other <br />documents as necessary, process and authorize progress payments <br />including allowance accounts and change orders, review and accept as- <br />built drawings, utilize MDWASD Project Control Tracking System to track <br />all documents and activities, interface with the design-build criteria <br />professional and the design-build contractor as needed. Development <br /> <br />Le Cartier Condominiums, 201 178th Drive, Sunny Isles Beach, <br />Florida 33160 (May 2010 to September 2010) Le Cartier <br />Condominiums is an existing apartment complex located in the city of <br />Sunny Isles Beach, comprised of 160 units divided among 7 attached <br />buildings of 5 stories each. The complex is approaching its 40th <br />anniversary and has extensive concrete deterioration damage along its <br />balconies, walkways and most exterior surfaces, due mostly to water <br />intrusion and its proximity to salt water. KM Engineering Consultants, <br />Inc. (KMEC) was contracted to carry out a study of the damage and <br />provide an engineer's report of the findings and remediation <br />recommendations. In addition we produced a set of construction <br />documents for the restoration of the complex. The restoration project <br />began in May 2010. KMEC will be managing the restoration process and <br />acting as liaison between all contractors involved and the board of <br />directors. <br /> <br />, <br />) <br /> <br />I <br />) <br /> <br />I <br />" I <br /> <br />18625 Atlantic Blvd, Sunny Isles Beach, FL 33160 Phone 786-586-7779 Fax 305-402-2208 E-mail Kouroche@kmecinc,com <br />