|
<br />
<br />)
<br />)
<br />
<br />ACADEMIC
<br />BACKGROUND
<br />B.S., Civil Engineering,
<br />Ohio University, 1983
<br />
<br />PROFESSIONAL
<br />REGISTRATION
<br />Registered Professional
<br />Engineer, FL #440/6
<br />
<br />PROFESSIONAL
<br />CERTIFICATIONS
<br />Advanced Work Zone
<br />Traffic Control Certified, FL
<br />
<br />RFP#11-11-02
<br />
<br />Mr. Kline has over 27 years of engineering design and management experience with projects
<br />involving roadway design, transportation planning and land development. Mr. Kline has become
<br />proficient in the engineering design aspects of roadway geometrics, drainage, signing and
<br />pavement marking, signalization, lighting and work zone traffic control. He has expertise in the
<br />use ASSHTO design guidelines and manuals, the FDOT Plans Preparation Manual, the FDOT
<br />Design Standards, the FDOT Standard Specifications, the Florida Greenbook, the Manual on
<br />Uniform Traffic Control Devices (MUTCD) and other important design standards and criteria.
<br />He has been responible for preparing and processing permit applications through South Florida
<br />Water Management District (SFWMD) and various local water management authorities.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />DISTRICTWIDE GENERAL IN-HoUSE CONSULTANT, FDOT DISTRICT 4:
<br />Responsible for constructability, bidability, and quality control reviews related to transportation
<br />facilities. The nature of reviews included roadway design, rehabilitation, and resurfacing projects.
<br />Provide design services for support of FDOT in-house design projects. Client: FDOT Distria 4.
<br />(3/ II to Present)
<br />
<br />LAs o LAS BOULEVARD/SR-842 ENHANCEMENT PROJECT, FORT lAUDERDALE,
<br />FL: Project Manager and Engineer of Record for the preparation engineering design plans
<br />for the milling, resurfacing, reconstruction and widening of Las Olas Boulevard/SR-S42 from
<br />Birch Road to Ocean Boulevard/SR-A I A. This project involved the preparation of roadway,
<br />signing and marking, signalization, lighting, and landscape plans, drainage modifications, and
<br />utility coordination/relocation. Client: City of Fort Lauderdale. (12/05 to 12/07)
<br />
<br />YAMATO ROAD, BOCA RATON, FL: Project Manager and Engineer of Record for the
<br />preparation of engineering design plans for the milling, resurfacing, and widening of Yamato
<br />Road from Jog Road to the Military Trail. This project involved the preparation of roadway
<br />plans, signing and marking plans, signalization plans, and drainage analysis and permitting, and
<br />utility coordination/relocation. Client: City of Boca Raton. (1/03 to 6/06)
<br />
<br />ANDREWS AVENUE EXTENSION - SEGMENT 1, FPID: 230619-1-52-01,
<br />BROWARD COUNTY, FL: Design Engineer for the production of roadway plans and
<br />documents including roadway plans, storm drainage, striping plans, signal plans, landscaping
<br />as well as utility coordination, permitting and specifications preparation for the construction
<br />of new 1.0 mile, 4-Lane divided facility between Hammondville Road and NW ISth Street
<br />in Pompano Beach, Florida. Client/Contact: FDOT Distria 4/Leslie Wetherell, P.E. Phone: (954)
<br />777-4438, email: leslie.wetherell@dotstate.fl.us
<br />
<br />ANDREWS AVENUE EXTENSION - SEGMENT 2 AND 3, FPID: 230622-132-01
<br />& 230725-1-32-01, BROWARD COUNTY, FL: Design Engineer for the production of
<br />roadway plans including coordination of roadway sub consultants. Keith and Schnars designed
<br />the bridge plans, storm drainage, striping plans, signal plans, landscaping as well as utility
<br />coordination, permitting and specifications preparation for the construction of new 1.5 mile,
<br />4-Lane divided facility between Atlantic Boulevard and NW 10th Street in Pompano Beach,
<br />Florida. Client/Contact: FDOT Distria 4/Leslie Wetherell, P.E. Phone: (954) 777-4438, em ail: leslie.
<br />wetherell@dotstate.fl.us. (12/02 to 12/05)
<br />
<br />EL RIo CANAL SHARED USE PATHWAY- LWDD L-40 CANAL TO CONGRESS
<br />AVENUE, FDOT LAP, FPID: 423812-1-58-01, BOCA RATON, FL: Project Manager
<br />and Engineer of Record. Project scope included the design of a 12 foot wide concrete shared
<br />use pathway and coordination of permitting efforts to allow for construction the pathway
<br />within the boundaries of the Yamato Scrub Oak Preserve, a Section 4f property. Included in
<br />the project was the coordination of landscape and site amenities, and a signalized crossing at
<br />Congress Avenue. Client: City of Boca Raton. (2/ 10 to 8/ II)
<br />
<br />" ."'-'--~'Ji~~~''-~f.i:~''...
<br />
<br />-
<br />
<br />::~;,~'~ KEITH and SCHNARS, P.A.
<br />:l ~: ;:: FLORJDAs Bjpi!DCAL FIRM
<br />~
<br />
<br />PAGE 41
<br />
|