My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T&M Protection Resources, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-02 Security Consultant
>
Responses
>
T&M Protection Resources, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 10:17:57 AM
Creation date
2/21/2012 10:15:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Security Consultants
Bid No. (xx-xx-xx)
12-01-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
") <br />) <br />) <br /> <br />) <br /> <br />) <br />) <br /> <br />) <br /> <br />) <br /> <br /> <br />Prolection Resources <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 18 <br /> <br />. Develop specifications for proposed components <br />. Prepare preliminary control center layout <br />. Attend meetings to discuss progress <br /> <br />) <br /> <br />Design criteria narratives and/or technical memorandum will be prepared with sketches to illustrate each <br />conceptual plan. As appropriate, technical analysis will be included that quantifies the impacts of the <br />proposed improvements including those related to traffic, construction, environmental as well as special <br />design consideration that would need to be addressed during final design. <br /> <br />) <br /> <br />The project team will submit to the City a preliminary construction cost estimates based upon the preliminary <br />design work conducted. <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />Upon approval of the city to progress, the team will refine the preliminary plans and develop plans and <br />specifications for request for proposals. Construction and procurement level documents will be prepared and <br />include the following efforts: <br />. Finalize field data for site locations <br />. Finalize base mapping in AutoCAD for project sites <br />. Finalize fiber optic network and IT infrastructure drawings <br />. Finalize detail for mounting of mounting of equipment <br />. Finalize control room design and system requirements <br />. Finalize specification document, with contractual, technical and operational terms detailed for the <br />bidding purposes for the procurement of equipment <br />. Attend meetings to discuss progress. <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />Bids review and monitoring of the proposed system installation will also be included in our services to the <br />City. <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 18 <br />230 Park Avenue, Suitc 440, Ncw York, NY 10169 . tel: 212.422.0000 . tax: 212.422.3305 . www.tmprotcction.com <br />This busincss is 1iccnscd by the Ncw York Dcpartmcnt of State, Division of Liccnsing Serviccs <br />
The URL can be used to link to this page
Your browser does not support the video tag.