Laserfiche WebLink
<br />Preview <br /> <br />Page 2 of2 <br /> <br />3. West Construction, Inc. <br />Base Bid: $151,289.00 <br />Completion time: 189 days (smaller structure than the other proposers) <br /> <br />Based on the proposed conceptual drawings and approach to the fabrication and <br />installation of the canopy assembly by USA Shade and Fabric Structures, Inc., City staff <br />is recommending award of contract to the same for an amount not to exceed $334,623.00. <br />USA Shade and Fabric Structures, Inc. provided an approach to the project that would <br />provide the City with a canopy design that is effective, creative, and aesthetically <br />pleasing. <br /> <br />FUNDING SOURCE: <br /> <br />Funding is available in 35-600-5663 for the Heritage Park Canopies <br />Funding is available in 35-600-5612 for the Golden Shores Park Canopy <br /> <br />ATTACHMENTS: <br /> <br />. <br /> <br />Resolution <br /> <br />. <br /> <br />Zurqui Conceptual Renderings <br /> <br />. <br /> <br />West Construction Conceptual Renderings <br /> <br />USA Shade Conceptual Renderings <br /> <br />http://sibagenda.sibfl.net/agenda/Preview.aspx?! temID=67 5&MeetinglD=0&MeetingDat... 12/21/2011 <br />