Laserfiche WebLink
<br /> <br />3.1 PHASE TWO <br /> <br />After a solution is agreed upon the consultant shall propose a price to design the accepted <br />solution, and prepare a scope of work and engineers estimate that will be used to go out to bid <br />for the construction of the accepted solution. <br /> <br />END OF SECTON <br /> <br />City of Sunny Isles Beach I Request for Proposal No. 12-04-03 <br /> <br />