My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis & Rogers Design
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Curtis & Rogers Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2012 12:04:20 PM
Creation date
5/2/2012 11:55:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design and Permitting Svcs for Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />') <br />) <br />) <br />) <br />) <br />E ') <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Services <br />Capital Improvements Plan <br /> <br />Start/Com pletion <br />January 2007/0ctober 2009 <br /> <br />Cost <br />600,000 Phase I <br /> <br />Refel'ences <br />Bayfront Park Management Trust <br />301 N Biscayne Boulevard <br />Miami, Florida <br />305-358-7550 <br />Tim Schmand <br /> <br />I ... <br />- ---, <br /> <br />) <br />) <br />) <br />) <br />) <br /> <br />The Mildred and Claude Pepper Bayfront Park <br />Miami, Florida <br /> <br />~ <br /> <br /> <br />~. <br /> <br />~ 'i! <br /> <br />In 2007, the City of Miami commissioned a "Capital Improvement Plan" for Bayfront <br />Park. This plan was preceded by work done for the City in 2003 by the BNV Cor- <br />poration. The Capital Improvement Plan built on the recommendations of BNV who <br />suggested the following improvements: 1) address the park's "empty heart"; 2) make <br />the Baywalk a "pleasurable walk" by decreasing the scale and adding much needed <br />shade; 3) investigate the feasibility of creating a restaurant/retail space at the base <br />of the nonfunctioning "laser light tower"; 4) connect the amphitheater to Bayside <br />Marketplace, the Baywalk and the hotel to the south; 5) enhance the good features <br />like the Rock Garden and the lawns; 6) address the need for shade by planting shade <br />trees; 7) address the existing paths which "frustrate" the desire for direct functional <br />access, particularly between the downtown area and the bay; 8) improve the horticul- <br />ture; 9) address the perimeters of the park which tend to be "parched and dull" and/ <br />or "complicated and ugly"; and 10) provide informational and wayfinding signage, <br /> <br />Curtis + Rogers along with their sub consultants produced three documents for the <br />"Capital Improvements Plan," The first was an in-depth analysis of the park includ- <br />ing functional environmental and aesthetic issues, the second was a series of pro- <br />posed improvements which could be staged and the third was an estimate of cost. <br /> <br />The initial phase of new construction, which includes improvements to the Baywalk, <br />was completed in April 2010. <br />Curtis + Rogers Design Studio RFQ 12-04-04 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.