<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />
<br />,
<br />J
<br />
<br />)
<br />
<br />\
<br />,
<br />
<br />)
<br />
<br />)
<br />
<br />Sel'vices
<br />Moster Plan, Design and
<br />Construction Documents
<br />
<br />Slod / Completion
<br />N/A
<br />
<br />Cost
<br />2,100,000
<br />Phose I
<br />
<br />References
<br />City of Boynton Beach
<br />100 Eost Boynton Beach Boulevard
<br />Boynton Beach, FL 33425
<br />561-742-6000
<br />Wally Majors
<br />Director of Recreation and
<br />Parks Deportment
<br />
<br />[3oynton Intracoastal Pork
<br />80'(10n Beach, Florida
<br />
<br />~
<br />
<br />
<br />r"~:':"'" ,., I
<br />, r--'" ,,' ", (
<br />
<br />i ': ""'''',' I
<br />
<br />I ....... 'I<
<br />
<br />.' .~" 1,'", "I> 'I' '1.
<br />
<br />'~1
<br />,J,
<br />~', .
<br />j"gl.
<br />',u,
<br />.' ~ J
<br />'; tl
<br />
<br />
<br />I.W'
<br />I .. ",
<br />
<br />..,
<br />~~
<br />;t~
<br />~
<br />
<br />r
<br />
<br />;
<br />
<br />t
<br />
<br />"r
<br />j
<br />';;..
<br />
<br />l_.,.."'.......
<br />
<br />.. ."....... '" ~.'_,h
<br />". .~, ,,,..
<br />
<br />i.'I~" ,'" , "'_,
<br />
<br />I..IASTER
<br />
<br />P), AN
<br />
<br />I 1'1 T R t\ C () 1\ S r t\ I. IV t\ T f: R W ,\ Y I' ,\ R K
<br />
<br />--~
<br />
<br />IlU) '''If)' HI..:\( U
<br />
<br />f 1 OH Ill'
<br />
<br />
<br />~,
<br />Gerald Marston and his Design team were selected to prepare a master plan for the last
<br />undeveloped parcel of land along the Intracoastal Waterway in Boynton Beach. The
<br />main focus in developing this prime waterfront property was the scenic enhancement
<br />and environmental restoration of the site. In particular, the park would allow the
<br />interpretation of Intracoastal marine life, salt tolerant/seaside plantings, and a native
<br />hardwood hammock which would enhance the educational value of the park.
<br />
<br />Following completion of the Boynton Intracoastal Park Master Plan, the team was
<br />retained to provide design and construction document services for the physical
<br />development of the site. The park development program was modified to substitute a
<br />two story community center for the picnic pavilion, and a large picnic shelter replaced
<br />the education center of the Master Plan. The final program also included three smaller
<br />picnic shelters, a tot lot and another restroom facility. The Veterans Memorial Shelter
<br />and event lawn were developed overlooking the storm water retention pond and floating
<br />fountain, A trail for walking and jogging, a conservation zone and on site parking
<br />complete the facility,
<br />
<br />Gerold MOI'stOIl, DirectOl' of Design 1m Culiis"- Rogers, served os Principal-ill
<br />ChOl'ge fat' this Project while wiih Wallace Roberts & Todd, LLC
<br />
<br />Curtis + Rogers Design Studio
<br />
<br />RFQ 12-04-04
<br />
<br />24
<br />
|