Laserfiche WebLink
<br />1') <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I ~ <br />lJ <br />I ~ <br /> <br />I , <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Local Experience <br />The second area of experience relevant to this contract is that experience that has provided Ardaman with <br />an understanding of the geologic conditions and the design/construction environment in South Florida, <br />including the beach areas. Over Ardaman's 52 year history our staff has successfully completed thousands <br />of projects in South Florida and hundreds of projects within geologic conditions similar to those found in the <br />Miami Beach, The following project list exhibits Ardaman's specific experience in South Florida. This list, <br />although representative, comprises only a small fraction of our experience in the greater Miami-Dade area. <br /> <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />proJectl Scope of Work Client Year Fee <br />Location Amount <br />Collins Park Geotechnical Investigation for the development of McHarry & Associates, Inc <br />Miami Beach the park that included percolation tests and soil Miami, FL , 2005 $3,380 <br /> borings, Geotechnical recommendations provided James Piersol, 305.445-3765 <br />South Pointe Geotechnical Investigation for the development of Hargreaves Associates 180 <br />Park, Miami the park that included percolation tests and 12 soil New York, NY, 2005 $7,230 <br />Beach borings. Geotechnical recommendations provided Jamie Maslyn, 212.337-9973 <br />Bal Harbor Geotechnical Investigation along the alignment of the Craig A Smith & Associates, <br />Forcemain force main from Bal Harbor to Miami Beach that Boca Raton, FI, 2011 $14,521 <br /> included 9 soil borings to 50 feet. Geotechnical Stephen Smith <br /> recommendations were provided 561-314-4454 <br />Haulover Geotechnical Investigation for the development of Westrec Marina Mg.t, <br />Marina the park that included 9 percolation tests and 15 soil Dallas, GA 2010 $22,140 <br /> borings on land and water to depths of 80 feet. Narvel Lassiter <br /> Foundation recommendations were provided, 678-574-6033 <br />SR 826/836 Geotechnical investigation for the interchange that FDOT District 6 <br />Interchange includes 50 bridges on variable soil conditions. Miami, Florida 1991 - <br /> Foundation recommendations for piles provided, The AIi Togliani PE 2008 $2 million <br /> soil investigation included 230 SPT borings to depths 3054705343 <br /> of 125 feet <br />MIC-MIA Geotechnnicallnvestigation for the railroad Miami International Airport <br />Elevated RR connector between the Miami airport and the MIC, Miami FL <br />MIA The geotechnical investigation included 30 borings to Gasser Douge PE 2002 $70,000 <br /> about 80 feet and recommendations for piles and 305-869-1953 <br /> shafts, <br />Port Boulevard Geotechnical investigation for the widening and new Foster Wheeler <br />Expansion alignment of Port Boulevard that included a new Miami, FL 2002- <br />Port of Miami bridge. A total of 35 SPT borings were completed to Julio Grave de Peralta 2003 $80,000 <br /> 80 feet. Recommendations for roadway soil 3057797819 <br /> properties and pile foundation design for the bridge <br />MIA, Material construction services and geotechnical work MDCAD <br />Concourse A for the construction of the Terminal A, Testing Miami, FL 2007- $400,000 <br />Terminal Exp, included concrete strength, density tests, LBR, pile Enrique Perez 2009 <br /> installation, asphalt inspections (plant and field), 308.869-3659 <br />Venetian Geotechnical investigation for the replacement of the Triangle Associates, Inc, <br />Causeway eleven bridges of the Venetian Causeway. A total of Hialeah, FL 2009 $250,000 <br />Miami- Miami 25 SPT borings to depths of 85 feet including 13 over Osiris Quintana <br />Beach, FI water to depth up to 15 feet. 305817 8443 <br />Brownsville The development includes 3 15 story residential Carlisle Development <br />Transit Village, towers and two parking garages, Both a geotechnical Miami, FL 2008- $127,500 <br />Miami investigation and construction inspection Get grouting Paul Prechter 2011 <br /> and piles) were provided 3053574725 <br /> <br />-=- Ardaman & Associates, Inc. <br />---==-...a..::= G~ole<:hnir.al, Envi/()Il11l(.ntl'l1 f\1J{j <br />~. Mal~l'IalS Consultants <br /> <br />Curtis + Rogers Design Studio <br /> <br />RFQ 12-04-04 <br /> <br />31 <br />