My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:12:10 PM
Creation date
5/3/2012 10:54:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & permitting for Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />.~ <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />Gustavo Santana <br />Landscape Designer <br /> <br />Gustavo Santana will be a Landscape Designer on the <br />project. Gustavo has over 10 years of landscape architectural <br />planning and design experience. Mr. Santana is a motivated <br />and resourceful designer who has been extensively involved <br />in master planning, site and detail design, construction <br />administration and project management on a variety of large <br />and small scale projects including recreational, commercial, <br />residential, educational, riverwalk and streetscape design. <br /> <br />--< <br /> <br />Ryan Cambridge <br />Landscape Designer <br /> <br />Ryan Cambridge will be a Landscape Designer on the project. <br />Ryan's background in sustainable design/planning has been <br />the cornerstone for his professional tenure with the belief <br />that the integration of sustainability at the environmental, <br />infrastructural, and economical levels of design are <br />prerequisite to the long-term success of any project. His <br />direct experience with the City of Doral Dog Park and the <br />City of Doral Parks System Master Plan bring very valuable <br />knowledge regarding the City of Doral's park planning and <br />design processes. <br /> <br />A:'COM <br /> <br />Thomas J. McMacken, Jr., RLA <br />Quality Assurance/Quality Control <br /> <br />Thomas J. McMacken, Jr. will responsi ble for the project's <br />Quality Assurance/Quality Control. His 32 years of <br />experience as a registered landscape architect, and his <br />passion for site design, construction documents, project <br />management and quality control allow him to provide <br />his clients with projects that compliment the design <br />capabilities that have long been the strength of the firm. <br /> <br />Jonathan Mugmon, SEGD <br />Environmental Graphic Designer <br /> <br />Jonathan Mugmon will be the Environmental Graphic <br />Designer on the project. With over twelve years experience <br />in development of wayfinding systems, interpretive planning <br />and community branding, and as the director ofthe <br />Wayfinding Practice at Design + Planning's Orlando office, <br />Jonathan has worked in a variety of wayfinding contexts <br />including municipal, public parks and trails, main streets and <br />urban areas, institutional and educational campuses, scenic <br />highways, and national historic sites. <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.