Laserfiche WebLink
<br />Brook Dannemiller, RLA, LEED@ AP <br />Landscape Architect <br /> <br />Years of Experience <br />9 years <br /> <br />Education <br />Bachelor of Science in Landscape Architecture (BSLA), Cornell University, <br />2002 <br /> <br />Professional Registrations <br />Registered Landscape Architect, FL #6667003 <br /> <br />Accred itation <br />LEED Accredited Professional, 2009 <br /> <br />Brook Dannemiller is a registered landscape architect <br />and LEED Accredited Professional with over nine years of <br />landscape architecture and planning experience. He has <br />been extensively involved in a diverse range of projects <br />including on structure landscapes, brownfield sites, <br />athletic fields and courts, community design and planning, <br />site and detail design, construction administration, <br />and project management on a variety of small and large <br />scale projects including commercial, residential, public, <br />educational, and military. <br /> <br />Project Experience <br /> <br />Heritage Park and Parking Garage, Sunny Isles Beach, FL <br />Landscape Architect. Landscape, hardscape, and site <br />planning design and construction administration services <br />for a 4 acre park and 4-level, 500 space parking garage. <br />Construction was completed in 2011. CLIENT: City of Sunny <br />Isles Beach. <br /> <br />Camana Bay, Grand Cayman Islands <br />Landscape Architect. Hardscape and landscape design for <br />a 120,000 sf, 4-story Block 8 building featuring plazas, a <br />lakefront esplanade and native plant material seamlessly <br />transitioned between the interior and exterior spaces. <br />Construction was completed in 2009. CLIENT: Spillis <br />Candela DMJM. <br /> <br />Reverse Osmosis Water Treatment Plant, Oldsmar, FL <br />LEED/Sustainability Consultant. Documentation and review <br />for LEED certification process for a new reverse osmosis <br />water treatment plant. CLIENT: City of Oldsmar. <br /> <br />Tuxedo Reserve Development, Tuxedo, NY <br />Project Manager/Landscape Architect and Urban <br />Designer. Prepared detailed design and grading for the <br />roads, lots, trail system, neighborhood park and greeting <br />center. Coordinated and integrated extensive stormwater <br />management requirements with civil engineers for the <br /> <br />52 <br /> <br />1 ,200-unit new urbanist community development, which <br />includes a new town center, school site, sports complex, <br />and wide range of housing types. The development <br />combines both quality community planning with sound <br />environmental practices, which includes preserving 80% <br />of the 2,400 acre site as permanent open space. CLI ENT: <br />Related. ARCHITECTS: Robert A.M. Stern Architects and <br />Minno & Wasko. <br /> <br />Arlington High School Remediation, Arlington, MA* <br />Project Manager/Landscape Architect. Replacement <br />of athletic facilities in conjunction with brownfield <br />remediation and engineered barrie geosynthetic <br />containment cap. Facility includes synthetic (Field Turf) <br />field, 6-lane track with field events, baseball and softball <br />fields, basketball courts, practice field, bleachers for 2,000 <br />spectators, stadium lights, and a pre-school playground. <br />Penetrations through the membrane had to be minimized <br />to maintain the integrity of the barrier and for sequencing <br />and scheduling, which resulted in a variety of unique <br />engineering details to accommodate the required athletic <br />facilities. The soils, soil depths, materials and drainage <br />were designed to assure the long term success of both <br />the brownfield remediation and the reconstruction ofthe <br />facility. Construction was completed in the fall of 2005. <br />CLIENT: Arlington High School. <br /> <br />Adelphi University, Garden City, NY* <br />Landscape Arch itect. Expansion of the Centers for Sports <br />and Performing Arts and redesign of approximately half of <br />the campus vehicular and pedestrian circulation. Facility <br />includes a synthetic (Field Turf) field on top of a parking <br />garage, a synthetic (Field Turf) practice field, tennis courts, <br />and a number of plazas. The design allows for efficient <br />vehicular circulation while providing direct pedestrian <br />movements between the heart of the campus and the new <br />facilities. The expansive parking ares required for the <br />large commuter based student population are organized <br />as a planting grove utilizing the long planting islands to <br />collect and help clean the parking lot storm water before <br />it enters the extensive system of drywells being installed. <br />Construction was completed in 2008. CLIENT: Aldephi <br />University. ARCHITECT: Cannon Design - Boston Office. <br /> <br />Harrison Commons, Boston, MA* <br />Landscape Architect. Landscape courtyard for new 136- <br />unit apartment building. The courtyard is entirely over <br />the roof and elevator shaft of the parking garage below <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />Ao.""COM <br />