Laserfiche WebLink
the apartment building. Existing grate relationships and <br />handicap accessible walks influenced the stepped garage <br />roof, the soil depths, and the design and layout of the walks <br />and landscape. Construction was completed in 2006. <br />CLIENT: Harrison Commos Development Company. <br /> <br />'\ <br /> <br />United States Federal Office Building, Washington, D.C. <br />(ATF Headquarters)* <br />Landscape Architect. The site is a former brownfield <br />site and is a LEED certified project. Security issues were <br />paramount in the design ofthe building and site, which <br />required sensitive integration of security elements into the <br />overall site design. The site has multiple green roofs and <br />courtyards that are on structure. The new streetscapes <br />are intended to set the precedent for future street <br />improvements in the area. Construction was completed in <br />2008. CLIENT: U.S. General Services Administration (GSA). <br />ARCHITECT: Moche Safdie & Associates, Inc. <br /> <br />" <br />1 <br /> <br />'. <br />) <br /> <br />j <br /> <br />* Denotes project experience prior to joining AECOM. <br /> <br />'\ <br />./' <br /> <br />, <br />; <br />./ <br /> <br />~;i <br /> <br />" <br />j <br /> <br />j <br /> <br />j <br /> <br />j <br /> <br />J <br /> <br />j <br /> <br />A:=-coM <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />53 <br />