Laserfiche WebLink
<br />~ <br />I <br />I <br />I <br /> <br />Ryan Cambridge <br />Landscape Designer <br /> <br />Years of Experience <br />3 years <br /> <br />Education <br />Bachelors of Science in Landscape Architecture, Honors, Minor in Art & <br />Design, Purdue University, 2009 <br /> <br />Certifications <br />Certified LiveRoof@ Modular Green Roof Installer <br /> <br />Affiliations <br />Associate Member American Society of Landscape Architecture, 2010 <br />Rails To Trails <br />Boiler Green Initiative, 2006-2007; 2008-2009 <br /> <br />Awards + Honors <br />University Olmsted Scholar, Landscape Architecture Foundation, 2009 <br />Award of Merit, The Honor Society of Agriculture, 2009 <br />Student Honor Award, American Society of Landscape Architecture, 2008 <br /> <br />Mr. Cambridge's background in sustainable design/planning <br />has been the cornerstone for his professional tenure with <br />the belief that the integration of sustainability at the <br />environmental, infrastructural, and economical levels of <br />design are prerequisite to the long-term success of any <br />project. Mr. Cambridge's professional exposure is broad, <br />leadi ng the conceptualization, production and management <br />of projects ranging from high-end residential design to <br />parks system master planning. <br /> <br />Project Experience <br /> <br />City of Doral Dog Park, City of Doral, FL <br />AECOM worked with the City of Doral and FPL to transform <br />a 5 acre, partially submerged transmission line easement <br />into the City's first, fully accessible Dog Park. A series of <br />programmatic spaces were developed on the site to allow <br />for a mixed range of both human and canine recreation <br />and interaction. This park also serves as a major trailhead <br />for the shared-use trails running through the site. Mr. <br />Cambridge acted as a project manager and lead designer for <br />the City of Doral Dog Park. <br /> <br />City of Doral Parks System Master Plan, City of Doral, FL <br />The City-Wide Parks and Recreation Space Master Plan <br />analyzes the existing parks system, which reflects the <br />City's suburban heritage, and creates a new vision for <br />the City's future. Major components of the Plan in which <br />Mr. Cambridge participated include an analysis and <br />assessment of previously developed studies and reports, <br />a city-wide and neighborhood demographics analysis; <br />existing system analysis; a needs and priorities assessment <br />that includes public workshops, interviews with elected <br /> <br />officials and key stakeholders, focus group interviews, <br />a mail/telephone survey and a level of service (LOS) <br />evaluation. The Plan also includes a parks system vision <br />plan; development of individual parks master plans and <br />neighborhood improvement plans; and a cost estimate and <br />implementation strategy. <br /> <br />City of Sunrise Needs Assessment, Sunrise, FL <br />Located in South Florida, Sunrise was born out of the <br />sprawling suburban network of Miami-Dade County only <br />50 years ago. Now, in an effort to continue to provide high <br />quality recreational opportunities for their residents, <br />we were asked to perform a comprehensive parks and <br />recreation needs assessment for the City. This report <br />will help to help guide the development of the Sunrise <br />parks system over the next 10 years. For this project, Mr. <br />Cambridge led the team in the development of the needs <br />assessment report; analysis documents; and participated <br />in client/public facilitation and project management <br /> <br />City Lenexa Parks and Recreation Comprehensive Plan, <br />Lenexa,KS <br />The City of Lenexa selected AECOM to develop their <br />first Parks and Recreation Comprehensive Plan in 2011. <br />Currently in progress, the plan will include an extensive <br />analysis of the existing system, a comprehensive needs <br />assessment, the development of Level of Service <br />standards, programming evaluation, a long range vision, <br />and a feasible implementation plan. Mr. Cambridge is <br />currently working with the Client and five sub-consultants <br />to successfully manage the project to its anticipated <br />completion in early 2012. Additionally, Mr. Cambridge is <br />primarily responsible for the production of many of the <br />AECOM deliverables for this project including the Needs <br />Assessment, Vision Plan, and Implementation Plan. <br /> <br />City of Norfolk Parks and Recreation Master Plan, Norfolk, <br />VA <br />The City of Norfolk selected AECOM (formerly Glatting <br />Jackson) to develop a long range City-wide Recreation, <br />Parks and Open Space Master Plan, including an existing <br />system analysis; needs assessment; long range vision; <br />and implementation strategy. The highlight of the project <br />was a three day visioning charrette, involving staff, <br />consultants and community stakeholders, to develop long <br />range visions for nine (9) elements of the system: parks, <br />community centers, therapeutic recreation, athletic fields, <br />bikeways and trails, beach and water access, public art <br /> <br />56 <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />Ao."""COM <br />