My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:12:10 PM
Creation date
5/3/2012 10:54:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & permitting for Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Design Manual. Furnishing Specifications for the executive <br />floor included a custom millwork reception desk at the <br />building's ground floor lobby. DHL Global Mail expansion <br />Programming services for approximately 8,500 square <br />feet for DHL Express Global Mail occupancy at Weston. <br />Following DHL:s Interior Design Manual, the project involves <br />full programming and test-fit based on DHL standards for <br />Global Mail's expansion. <br /> <br />, <br />, <br />; <br /> <br />Miami Carol City Senior High School Replacement - State <br />School'LLL', Miami, FL <br />AECOM was hired to undertake the task of replacing an <br />existing school by constructing new facilities in phases <br />on the existing open spaces (playing fields) while keeping <br />the school fully operational. This will be the first senior <br />high school constructed by Miami-Dade County Public <br />Schools using Academy components to create small <br />learning communities that encourage student interaction <br />within each related academic area, and reduce the need for <br />students to engage the whole student body. <br /> <br />Middle School Prototypes MM-1, UU-1, & PP-1, Miami, FL <br />Architectu ral and Engineering services for the development <br />of a Middle School prototype, this project will include an <br />initial6-week research and development phase, with the <br />intent to re-examine the school district design parameters <br />and fully develop the overall program for the prototype <br />facilities district-wide. Phase I of Middle School project <br />is design and construction of an 116,612-square-foot <br />prototype facility, to be planned with future expansion in <br />mind. The prototype will subsequently be adapted for new <br />Middle Schools on a minimum of three further sites. <br /> <br />-.C <br /> <br />Sustainability Consultant for projects in Design Phase at <br />AECOM: <br />Camana Bay Office Building <br />GE Headquarters <br />Doral Park/Golf Course <br />Baha Mar Beach Club <br />Antigua Airport <br /> <br />A::-coM <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No, 12-04-04 <br /> <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.