Laserfiche WebLink
1 <br /> <br />Leo Giangrande, P.E. <br />Civil Engineer <br /> <br />Years of Experience <br />17 years <br /> <br />Education <br />BS, Civil Engineering, George Mason University, 1995 <br /> <br />Professional Registrations <br />Professional Engineer, FL, #66387, 2007 <br /> <br />Affiliations <br />National Society of Professional Engineers <br />Future Group of Martin County <br />Institute ofTransportation Engineers <br />Florida Engineering Society <br />Young Professionals of Martin County <br /> <br />Mr. Giangrande joined the AECOM team in March 2006 <br />where he is responsible for the management of the firm's <br />traffic services in Florida. He has served as project <br />manager for numerous transportation projects throughout <br />the eastern Florida, Virginia, Maryland and West Virginia. <br />Mr. Giangrande experience includes numerous projects <br />ranging from transportation planning, traffic engineering <br />studies, environmental studies, and all the diverse range <br />of approvals and typical civil designs required for land <br />development. Leo has also provided services in the area <br />of concurrency evaluation, transportation planning, <br />environmental permitting, regulatory coordination, and the <br />design of project infrastructure required for all types of <br />land development both private and municipal. <br /> <br />Project Experience <br /> <br />Hillsboro El Rio Park, Boca Raton, FL <br />Principal-in-Charge/EOR. Responsibilities include <br />coordination with design team, City Parks Department, site <br />engineering, landscape and irrigation design, site lighting, <br />surface water management and utility design. This project <br />included the multi-purpose fields, tennis courts, basketball <br />courts, fishing piers and structures to service the park. <br />The project had some unique challenges that included the <br />property being a 30 year old landfill, fishing pier lighting, <br />water and sewer availability, monitoring plan, security <br />access and grading. Managed and responsible for all <br />components of project from planning to final design. <br /> <br />Sand Pine Park, Boca Raton, FL <br />Pri nci pal-i n-Charge/EOR. Responsi bi lities include <br />coordination with design team, City Parks Department, <br />site engineering, construction inspections, landscape and <br />irrigation design. This project included the installation and <br /> <br />design of a master drainage system, installation of two <br />artificial turf multisport fields which included sidewalks, <br />"bubble misters", maintenance paths for access. Managed <br />and responsible for all components of project from planning <br />to certification and occupancy. <br /> <br />Phil Foster Park, Riviera Beach, FL <br />Principal-in-Charge. Responsibilities include coo'rdination <br />with design team, site engineering, construction <br />inspections, electrical engineering, architectural design, <br />dock design, boat lift design and landscape architecture. <br />Managed and responsible for all components of project <br />from planning to certification and occupancy. <br /> <br />Moroso Park, Riviera Beach, FL <br />Principal-in-Charge. Responsibilities include coordination <br />with design team, site engineering, construction <br />inspections, electrical engineering, architectural design, <br />dock design, boat ramps and seawall design and landscape <br />architecture. Managed and responsible for all components <br />of project from planning to certification and occupancy. <br /> <br />City Engineer for City of Palm Beach Gardens, FL <br />Palm Beach Gardens City Engineering duties including <br />all engineering reviews, public meetings, construction <br />management and coordination with surrounding <br />municipalities. Performed services as required for the City <br />Engineering Department. <br /> <br />Doral Canal Bank Stabilization Program Years 3 and 4, <br />Doral, FL <br />Principal in Charge/Project Manager. Responsibilities <br />include to coordinating with the design team, geotechnical <br />coordination, hydraulic design, canal stabilization design, <br />multi-model trail design with intersection modifications, <br />signage and striping. Project required input of the project <br />stakeholders which included City Public Works Staff, City <br />Arborist, Miami Dade County, adjacent residences and <br />business. Managed and responsible for all components of <br />project from planning to certification. <br /> <br />Treasure Coast Research and Development Park, St. Lucie <br />County, FL <br />Project Manager. Responsibilities included municipal <br />coordination, public involvement, utilities design and <br />coordination, FDOT coordination, site engineering, <br />permitting and bid and award preparation. This <br />project included conceptual design and permitting <br /> <br />66 <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No, 12-04-04 <br /> <br />A:.""COM <br />