|
<br />I
<br />
<br />i
<br />
<br />-i
<br />
<br />Flagler County Courthouse, Bunnell, FL
<br />Electrical Engineer for a new courthouse which will contain
<br />approximately 137,805 square feet of space in a multi-story
<br />structure including six courtrooms, judicial chambers, Clerk
<br />of Court support space, and offices for the State Attorney
<br />and Public Defender. The complex also includes parking for
<br />375 cars.
<br />
<br />Clay County Courthouse Expansion & Renovation, Green
<br />Cove Springs, FL
<br />Electrical Engineer for a 4-story 89,000 square feet addition
<br />to the existing courthouse to include four new state of
<br />the art courtrooms, prisoner holding cells, eight judicial
<br />chambers, and consolidated offices for the Clerk of Court,
<br />as well as building support spaces. Renovation work
<br />in the existing 74,000 square feet courthouse included
<br />the redesign of the State Attorney, Public Defender, and
<br />miscellaneous court support space.
<br />
<br />Collier County Courthouse Annex, Naples, FL
<br />Electrical Engineer. The Courthouse Annex consists of
<br />a seven story, 137,000 square feet addition linked to the
<br />existing courthouse by a new four story atrium. The Annex
<br />houses the offices for the Clerk of Court, State Attorney,
<br />and Public Defender. A generous four story high atrium
<br />connects the two wings and allows for a gracious public
<br />space within the building.
<br />
<br />Telefonica, Miami, FL
<br />Electrical Engineer. The 45,000 square feet, Phase I of this
<br />project was for Telefonica Data and is located within a two-
<br />building 170,000 square feet complex. The overall concept
<br />of the telecommunications hotel is to lease the technology
<br />equipped space and/or the computer server equipment
<br />located at the 'hotel' to host individual web sites.
<br />
<br />Broward County, Fort Lauderdale/Hollywood International
<br />Airport Rental Car Facility and Parking Garage, Fort
<br />Lauderdale, FL
<br />An on-site 9-story, 9,000-car, 4.3-million-square-
<br />foot facility to accommodate a full-range of rental car
<br />concessions for up to 12 companies with additional short-
<br />and long-term visitor parking. The facility was designed to
<br />work in conjunction with the airport transportation systems
<br />and traffic patterns, to provide quick and convenient access
<br />for airport visitors. The design also includes a peoplemover
<br />transit station that will be connected to a future intermodal
<br />complex. The design includes complex negotiations and
<br />
<br />coordination with authorities having jurisdiction to allow for
<br />indoor fueling.
<br />
<br />Nashville-Davidson County, Justice A.A. Birch Courthouse
<br />and Ben West Building Renovation, Nashville, TN
<br />AECOM, in association with another firm, was selected to
<br />provide complete design services for the construction of
<br />a new 237,204-square-foot courts facility and renovation
<br />of the adjacent 39,400-square-foot Ben West building. The
<br />6-story courthouse houses the criminal court components
<br />of the Nashville-Davidson County court system. These
<br />include 16 courtrooms and chambers, sheriff's central
<br />holding facilities, jury assembly, the general sessions and
<br />trial court clerk of Court offices, and other administrative
<br />and support space.
<br />
<br />Cayman International School, K-12, Grand Cayman, British
<br />West Indies
<br />The K-12 private educational facility accommodates
<br />approximately 500 students on a 9-acre campus.
<br />The building program includes 32 classrooms; three
<br />independent lab buildings; a combined administration and
<br />library building; and a multipurpose building for auditorium,
<br />gym, and dining functions. Each of the 2-story classroom
<br />buildings defines a specific age group (early development,
<br />elementary, middle, and high school). Landscaped
<br />courtyards between buildings provide passive and active
<br />play areas, as well as opportunities for outdoor teaching.
<br />A covered walkway connects all the classroom buildings.
<br />Recreational spaces include playing fields, hard courts, and
<br />swimming pool.
<br />
<br />Simon Property Group, Downtown Dadeland, Miami, FL
<br />Carved from existing anonymous strip shopping centers,
<br />the new village within the city consists of seven new city
<br />blocks in a traditional urban grid. The project features 416
<br />condominium units in buildings up to seven stories high
<br />and 112,000 leasable square feet of retail neighborhood-
<br />oriented shops and national brands. The 1,000-car parking
<br />garage was designed partially below grade, a unique
<br />attribute to parking garages built in South Florida.
<br />
<br />A:""CONI
<br />
<br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No, 12-04-04
<br />
<br />73
<br />
|