My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:12:10 PM
Creation date
5/3/2012 10:54:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & permitting for Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />-t <br /> <br />interconnect Seacoast Richard Road Treatment Plant with <br />their Hood Road Treatment plant. The project involved <br />setting up horizontal and vertical control, locating all above <br />ground improvements and surface evidence of subsurface <br />utilities, establishing a construction baseline, and road <br />right-of-way line determination by putting together right-of- <br />way maps, plats, and deeds of records. <br /> <br />Town of Palm Beach Force Main, Palm Beach, FL <br />Prepared Topographic Route Survey. The project consisted <br />of a three miles of topographic route survey to interconnect <br />existing lift stations with a new larger diameter force main <br />along Ocean Avenue in Palm Beach. The project involved <br />setting up horizontal and vertical control, locating all above <br />ground improvements and surface evidence of subsurface <br />utilities, establishing a construction baseline, and road <br />right-of-way line determination by putting together right-of- <br />way maps, plats, and deeds of records. <br /> <br />Heft Road, Homestead, FL <br />Responsible for directing and supervising on site survey <br />field crews in field traversing and establishing horizontal <br />and vertical control; balancing traverses, processing field <br />data, and establishing alignment of baseline, centerline, <br />and right-of-way; and preparing Florida Department of <br />Transportation quality design surveys. <br /> <br />Stuart Jet Center, Martin County, FL <br />Served as team leader responsible for extensive topography <br />of an existing site and multiple boundary surveys for a <br />continuing project. <br /> <br />Martin County School Board, Martin County, FL <br />Performed the boundary and topographic surveys for the <br />Hobe Sound and Warfield elementary schools. <br /> <br />k-coM <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No, 12-04-04 <br /> <br />77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.