Laserfiche WebLink
<br />I <br />I <br />J <br /> <br />Brian C. Kiernan, PSW <br />Project Surveyor <br /> <br />Years of Experience <br />29 years <br /> <br />Education <br />Indian River Community College and other accredited organizations, <br />Continuing Education <br /> <br />Professional Registrations <br />Professional Land Surveyor, FL, #LS6101, 2000 <br /> <br />Affiliations <br />Florida Surveyors and Mappers Society, Indian River Chapter <br /> <br />Mr. Kiernan is a Survey Team Leader who joined AECOM <br />Technical Services, Inc., in 1985. He has over 29 years <br />of surveying and mapping experience. He has worked <br />on projects for both public and private clients, including <br />boundary and topographic surveys, right-of-way mapping, <br />route surveys, jurisdictional boundaries, legal descriptions, <br />and platting. He is proficient in both AutoCAD Land <br />Desktop 2007, TDS data collection software and SKI Pro <br />GPS software. <br /> <br />Project Experience <br /> <br />State Road 5, Martin County, FL <br />Project consisted ofthe directing and supervising of site <br />survey field crews in field traversing and establishing <br />horizontal and vertical control. Balancing traverses, <br />processing field data, and establishing alignment of <br />baseline, centerline, and right-of-way. Preparing FDOT <br />quality design surveys. <br /> <br />State Road A1A, St. Lucie County, FL <br />The project consisted of topographic route survey and <br />included the setting up of horizontal and vertical control, <br />establishing a construction baseline and road right-of-way <br />line determination by compiling rights-of-way maps, plats, <br />and deeds of records. <br /> <br />State Road 710, Okeechobee County, FL <br />The project consisted of field collecting data within subject <br />right of way and the production of right of way/route survey <br />for the purpose of future roadway expansion. <br /> <br />State Road 714, Martin County, FL <br />Prepared right of way route base map from information <br />gathered by field location and processing for the purpose of <br />future roadway expansion. <br /> <br />State Road 807, Palm Beach County, FL <br />Responsibilities include: Directing, including supervising on <br />site, survey field crews in field traversi ng and establishing <br />horizontal and vertical control. Balancing traverses, <br />processing field data, and establishing alignment of <br />baseline, centerline, and right-of-way. Preparing Right- <br />of-Way Control Map, preparing Right-of-Way Map, and <br />preparing sketch and description for acquisition parcel. <br /> <br />Martin County Airport Boundary Survey, Witham Field, <br />Martin County, FL <br />Team Leader - Project included boundary and topography <br />survey, horizontal and vertical ground control for digital <br />orthophotography aerial photos and planimetrics. <br /> <br />Ft. Pierce Utility Authority, Ft. Pierce, FL <br />Utility route surveys and produce sketch and descriptions <br />for land acquisition/conveyance. <br /> <br />U.S. 1 and Jensen Beach Boulevard, FL <br />Conducted design surveys, legal descriptions and <br />horizontal and vertical control aerial surveys for divided <br />urban roadway widening and intersection improvements. <br /> <br />Walton Road, FL <br />Conducted design surveys, horizontal and vertical <br />control, aerial surveys, and right-of-way map preparation <br />for approximately 4 miles of four-lane divided roadway <br />improvements. <br /> <br />Thomas B. Manual Bridge, Martin County, FL <br />Prepared Right-of-way map and boundary survey for the <br />Florida Turnpike District, Martin County. <br /> <br />South 25th Street, FL <br />Conducted design survey, prepared legal descriptions and <br />right-of-way survey for approximately 2.5 miles of fou r-lane <br />divided urban roadway improvements. <br /> <br />Palm Beach International Raceway, Palm Beach, FL <br />186 acre site included overall ALTAlACSM boundary <br />survey together with overall topographic survey showi ng <br />improvements. <br /> <br />Seacoast Utility 20" Raw Water Main & 20" Finished Water <br />Main Interconnect, FL <br />Prepared Topographic Route Survey base map. The project <br />consisted of a three miles of topographic route survey to <br /> <br />76 <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />A.""COM <br />