Laserfiche WebLink
<br />~ <br /> <br />Tropical Farms interconnect, Martin County, FL <br />Project Team Leader. Responsibilities included preparing <br />a topographic survey for a five mile route survey to <br />interconnect the existing sanitary lift station in Martin <br />Downs with the new proposed Waste Water Treatment Plant <br />proposed at Tropical Farms. The project involved setting up <br />horizontal and vertical control, locating all above ground <br />improvements and surface evidence of subsurface utilities, <br />establishing a construction baseline, and road right-of-way <br />line determination by putting together right-of-way maps, <br />plats, and deeds of records. <br /> <br />Evans Properties, St. Lucie and Okeechobee Counties, FL <br />Project Team Leader. Responsibilities included preparing <br />boundary and topographic surveys of nine square miles of <br />property for futu re land development. <br /> <br />CH2MHILL Florida Turnpike Survey, St. Lucie and <br />Okeechobee Counties, FL <br />Project Team Leader. Responsibilities included preparing <br />a topographic survey for three quarters of a mile of the <br />Florida's Turnpike and adjacent property. The topographic <br />survey collected 100-foot cross-sections and was sufficient <br />enough to prepare a digital terrain model of the site and <br />establish 1-foot contours. The project also established <br />right-of-way lines, and a survey baseline to reference the <br />design of a future proposed on and off ramp. <br /> <br />St. Lucie County, Heathcote Boundary Survey, St. Lucie <br />County, FL <br />The project consisted of an overall survey of the section <br />and the preparation of a boundary survey consisting of <br />64 acres. The project also included coordination with city <br />and county staff, and the Fort Pierce Utility Authority for <br />the preparation of 13 sketch and descriptions to cover the <br />existing utilities on the property. <br /> <br />City of Palm Beach Gardens, Thompson River Canal, Palm <br />Beach Gardens, FL <br />The project involved preparing a topographic survey <br />showing the limits of the existing canal right-of-way and <br />the locations of all above ground improvements. The <br />survey collected canal and bank cross-sections that were <br />shown on the survey in both plan and profile view for slope <br />restoration design. After completion of the construction as- <br />built cross-sections were obtained to verify slope grades. <br /> <br />City of Palm Beach Gardens, Earman River Canal, Palm <br />Beach Gardens, FL <br />The project involved preparing a topographic survey <br />showing the limits of the existing canal right-of-way and <br />the locations of all above ground improvements. The <br />survey collected canal and bank cross-sections that were <br />shown on the survey in both plan and profile view for slope <br />restoration design. After completion of the construction as- <br />built cross-sections were obtained to verify slope grades. <br /> <br />Fort Pierce Farms Water Control District, Taylor Creek, St. <br />Lucie County, FL <br />The project involved preparing a topographic survey <br />showing the limits of the existing creek right-of-way and <br />the locations of all above ground improvements. The <br />survey collected canal and bank cross-sections that were <br />shown on the survey in both plan and profile view for slope <br />restoration design. After completion of the construction as- <br />built cross-sections were obtained to verify slope grades. <br /> <br />The Bureau of Land Management, Jupiter Inlet Lighthouse, <br />Jupiter, FL <br />The project consisted of preparing a topographic survey <br />for channel bank restoration of the Intracoastal Waterway. <br />The survey involved obtaining cross-sections of the steep <br />western bank of the waterway and out into the channel to a <br />predetermined depth. The survey computed a digital terrain <br />model and mapped contours of the bank at 1-foot intervals. <br /> <br />Martin County, Martin County Mapp Road Town Center <br />Storm Water Management Project, Martin County, FL <br />The project involved preparing a boundary and topographic <br />survey base map for engineering design. The project <br />consisted of three quarters of a mile of roadway and the <br />boundary survey of a 19-acre parcel. The project was in <br />support of a surface water model and town center roadway <br />conceptual design with a surface water retention pond. <br /> <br />k""COM <br /> <br />City of Sunny Isles Beach I Design & Permitting Services of the Intracoastal Parks RFQ No. 12-04-04 <br /> <br />75 <br />