Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) (/) <br />c <br />) 0 <br /> .- <br />c ) ......., <br />ro <br />) () <br />) '+- <br />) CO <br />c ) ::::s <br />) a <br />) <br />) N <br />) C <br />0 <br />) +-' <br />) () <br />(J) <br />) U) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />C~EN lHOMPSON <br /> <br />f1 <br /> <br />& AsSOClJ>J'S INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 1..2.-04-04 (.." '\ <br />DESICiN AND PERM/lTINCi SERVICES OF THE INTRACOASTAL PARKS ':.--','........':.. <br />r_...."...... <br /> <br />SEAGRAPE DRIVE STREETSCAPE, PHASES I & II <br />LAUDERDALE-BY- THE-SEA <br /> <br /> <br />I~'Z . <br />, ,." I,. <br />~~, ';, ;, <br />, .. <br /> <br />'lf~ ' <br />j , <br /> <br /> <br />Owner: <br />Town of Lauderdale-by-the-Sea <br />4501 Ocean Drive <br />Lauderdale-by-the-Sea, FL 33308 <br />Phone: (954) 776-0576 <br /> <br />Client: <br />Mr. Walter H. Keller, <br />Walter H. Keller, Inc. <br />1890 University Drive, Suite 304 <br />Coral Springs, FL 33071 <br />Phone: (954) 755-3822 <br /> <br />Total Construction Cost: <br />Phase I - $75,000.00 <br />Phase II - $100,000.00 <br /> <br />Completion Date: <br />2008 <br /> <br />Construction Schedule: <br />Phase I - 9 Months <br />Phase II - 9 Months <br /> <br /> <br />Craven Thompson and Associates, Inc. was the <br />Landscape Architectural consultant for Walter <br />Keller, Inc. in the redesign of the streetscape <br />for both Phases of Seagrape Drive in the Town <br />of Lauderdale-by-the-Sea. A challenging <br />project because of the multi-family back-out <br />parking and single family homes, this <br />neighborhood street was turned from a wide <br />asphalt roadway with very little character, to a <br />beautiful, pedestrian-friendly streetscape. <br />Decorative lighting, decorative signage, <br />colored sidewalks, a bike path, paver <br />crosswalks, tree grates and extensive <br />landscaping transformed this roadway into a <br />beautiful corridor for the Town of Lauderdale- <br />by-the-Sea. Phase I of the project was <br />completed in 2005 with Phase II following up <br />in October, 2008. CTA was involved in all <br />aspects of the construction of the streetscape <br />project. <br /> <br />, I <br />! <br /> <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2136 <br />