Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) (f) <br />c <br />) 0 <br /> .- <br />} ......., <br />CO <br />) () <br />) '+- <br />) CO <br />) ::J <br />a <br />) <br />) N <br />) <br />) c <br />0 <br />) .- <br />......., <br />) () <br />OJ <br />) (/) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CR~EN lHQ.1IlPSON <br /> <br />f1 <br /> <br />& AsSOCIi'l's INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. :1..2.-04-04 (Ii ""\, <br />DES/CiN AND PERM/lTlNCi SERVICES OF THE INTRACOASTAL PARKS ~::..,_:,,:. <br /> <br />N.W. 12Sth STREET SWALE IMPROVEMENT <br />CITY OF NORTH MIAMI, FLORIDA <br /> <br /> <br />OWNER/CLIENT: <br />Mr. Gerardo Hernandez <br />Streets Supervisor <br />City of North Miami <br />1855 NE 142nd Street <br />North Miami, FL 33181 <br />305.895.9830 Ext. 14001 <br /> <br />COMPLETION DATE: <br />The last phase of construction <br />was completed in 2007. <br /> <br />CONSTRUCTION COST: <br />$1,200,000.00 <br /> <br /> <br /> <br />The NW 125th Street swale improvement <br />project was prepared for the City of North <br />Miami. The NW 125th St. improvements <br />extend from State Road 441 to NW 17th <br />Avenue. The improvements included <br />roadway resurfacing and curbing, isolated <br />drainage, concrete walks, paver parking <br />spaces and paved driveways with curbed <br />landscape islands, landscaping and <br />irrigation. Craven Thompson was actively <br />involved in the construction of the <br />roadway, hardscape, and landscape. The <br />project was constructed in multiple <br />phases at a total cost of approximately 1.2 <br />million dollars. <br /> <br />It.~ ...~ n <br />..... ' <br />-~~ <br /> <br /> <br /> <br />;,'.}"J' <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2137 <br />