Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) CJ) <br />) c <br />) 0 <br />) ......... <br />CO <br />) () <br />) '+= <br />) CO <br />) :::J <br />) a <br />) <br />) N <br />) c <br />) 0 <br /> .- <br />) +-' <br />() <br />) (j) <br />) (f) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. :1..2.-04-04 <br />DES/CiN AND PERMIlTINCi SERVICES OF THE INTRACOASTAL PARKS <br /> <br />~/o..~..."..,; <br />-', - .'. <br />~'o.:;_::~:>" <br /> <br />~I <br /> <br />architecture . engineering <br /> <br />CITY OF SUNRISE PASSIVE PARKS <br />Sunrise, Florida <br /> <br /> <br />ACAI, with eTA as the Prime Consultant, will <br />provide design and post design services to <br />include Architectural, Structural, Mechanical, <br />and Electrical engineering for the permitting <br />and delivery of these two Passive Park <br />projects for the City of Sunrise. <br /> <br />The N,W, 44th Street Passive Park Site (OS- <br />58) is a 11.17 acre vacant site located on the <br />south side of NW 44th Street approximately <br />1,500 feet west of Pine Island Road. Funding <br />for the acquisition of this site was provided <br />through the Broward County Land Preservation <br />Bond Program, Located adjacent to a canal <br />opposite single-family homes and next to <br />commercial development, this park site is a <br />perfect natural buffer between the two uses. <br />Construction cost for this site is estimated at <br />$4,000,000.00. <br /> <br />The other Passive Park site is known as the <br />Oakland Park Boulevard Site (GS-370) is a <br />7.93 acre vacant site located on the east side <br />of NW 90th Terrace between Oakland Park <br />Boulevard and NW 38th Street. Funding for <br />the acquisition ofthis site was provided through <br />the Broward County Land Preservation Bond <br />Program, Located amongst several multi- <br />family developments, this natural oasis <br />provides a tranquil setting for relaxation and <br />passive recreation. Construction cost for this <br />site is estimated at $1 ,500,000,00. <br /> <br />The project will include a trash dumpster <br />enclosure, an 800 sq, ft, restroom building, <br />a 600 If elevated boardwalk, a playground <br />shade structure, site lighting and a 16' x 16' <br />pavilions (three of identical design), <br /> <br />architecture <br /> <br />engineering <br /> <br />CR~EN lHO/I!1PSON <br /> <br />tJ <br /> <br /> <br />roofing consu#ing <br /> <br />construction management <br /> <br />& AsSOCIi'l's INC <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2141 <br />