My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:35:57 PM
Creation date
5/7/2012 2:28:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />~ ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />>> <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I',~, '..^ .....d Calvin. Giordano & Associates. Inc. <br /> <br />'~. 11 E x C E r T ION ^ l SOL 1I T ION S <br />""\oJ ~:-.t.> l <br />,."..... Ii <br /> <br />SABRINA BAGLIERI <br />Director, Construction Administration <br /> <br />SUMMARY OF QUALIFICATIONS <br />Ms. Baglieri has over 23 years civil engineering/construction management experience. <br />She is an expert in the selection, setup, management, and control of roadway, parks and <br />buildings projects: from the bidding processes to their completion and culmination. She <br />is also experienced in the management practices of hurricane debris collection <br />monitoring and data recording and with LAP compliance issues. Ms. Baglieri has <br />working computer knowledge on operative systems such as DOS, Windows and the <br />following programs: Cadd2000, Excel, Microsoft Word, Timberline, Construction Link <br />(CLI), Primavera, Power Point, and Quattro Pro for Windows. <br /> <br />Ms. Baglieri has extensive experience and knowledge directly applicable to all types of <br />projects, relying on her background in engineering, construction and project <br />administration. Furthermore, she is well versed in the municipal processes necessary to <br />get work tasks completed on time, as well as she has demonstrated experience working <br />within allocated budgets. These skills and aptitudes have all been exercised in her <br />capacity as Director of Capital Improvements for several local municipalities through <br />CGA's various continuing services municipal contracts. The breadth of her work has <br />spanned all realms of implementation projects - from small residential-scale, <br />community-scale, and urban scale. As such she has the necessary knowledge in the <br />management of the dynamics inherent in work scheduling, tasking, sequence matrices <br />necessary to maintain continuity of work and fulfillment of the assessed milestones. <br />These are important issues, especially when dealing with LAP funding, grants monies, <br />bond assessments, and in both responding to the expressed needs of the community and <br />to the management of complaints and issues in an expedited manner <br /> <br />PROJECT EXPERIENCE <br />City of Weston, Florida Projects <br />. Vista Park: <br />Boulevard: new roadway construction <br />Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2 <br />concession buildings, a maintenance building, and parking area. Provided <br />lighting, lift station, water and sewer designs <br />. Traffic Signals for Weston Road/South Commerce Parkway <br />. Tequesta Trace Concession Building Parking and Drainage <br />. Bonaventure Master Plan Phase I, II, III and IV. Upgrade of all drainage, <br />landscape, and roadway elements <br />. Saddle Club Rd @ South Post Road Roundabout <br />. Bonaventure Blvd. @ Blatt Road Roundabout <br />. New traffic signals for Weston Road/North Corporate Lakes <br />. FS 55 Emergency Signal <br />. Saddle Club/ Arvida/Bonaventure overlay of roads and road/drainage <br />improvements <br />. Bonaventure/Racquet Signal <br />. Regional Park/Parking Modification. Construction of Loop Road to connect <br />existing parking lots <br /> <br />EDUCATION <br /> <br />B.A., Civil Engineering, <br />Universidad Rafael Urdaneta <br />Maracaibo, Venezuela <br /> <br />CERTIFICATIONS <br /> <br />Governor's Hurricane <br />Conference <br /> <br />Recovery Disaster - The <br />Local Government Role <br /> <br />Erosion Control Certified <br />Inspector <br /> <br />CTOP Final Estimates 1 <br /> <br />CTOP Earthwork <br />Construction Inspector 1 <br /> <br />CTOP Asphalt Paving <br />Technician Level 1 <br /> <br />OSHA Construction Safety <br />+ Health <br />
The URL can be used to link to this page
Your browser does not support the video tag.