My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:35:57 PM
Creation date
5/7/2012 2:28:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />ATLANTIC ISLES ROADWAY <br />AND UTILITY IMPROVEMENTS <br />Sunny Isles Beach, Florida <br /> <br />,- <br /> <br />I <br /> <br />I <br /> <br />" <br /> <br />-- <br /> <br /> <br />The City of Sunny Isles Beach retained CGA to provide construction management services for the <br />Atlantic Isles Roadway and Utility Improvements project. CGA's scope of services includes: <br /> <br />Construction Administration: <br />. Assist in bidding process, including pre-bid, bid opening, recommendation of award and contract <br />execution <br />. Meet with contractor and appropriate regulatory agencies when requested, and necessary for <br />consultation or conferences in regard to construction of the project <br />. Issue interpretations and clarifications of the contract documents and evaluate requested <br />deviations from the approved design or specifications. In connection therewith, review, prepare <br />and process any work change directives or change orders requested by the contractor or city <br />. Review and process shop drawings, samples and other data which the contractor is required to submit <br />. Make daily inspections for compliance with plans and specifications. Make interim inspections <br />for substantial completion; review, approve and process pay requests and perform a final <br />inspection to determine, in general, if the work has been completed in conformance with the <br />intent of the contract documents <br />. Review and process as-built and closeout packages <br />. Civil plan reviews for quality control <br />. Permit applications and certifications <br /> <br />Civil/Roadway Improvements: <br />. Construction of roadway improvements, including construction of sanitary sewer collection <br />system with gravity sewer lines, manholes, WASD lift station and force main <br />. Paving, grading, and drainage improvements <br />. The installation of a new water main with services proposed by the City of North Miami Beach <br /> <br />Uti! ities: <br />. Coordinate and assist the City undergrounding of certain utilities, such as FPL power, CATV, and <br />telephone <br /> <br />12-4941 Sunny Isles Beach Intracoastal Parks <br /> <br />Client <br />City of Sunny Isles Beach <br /> <br />Contact information <br />at time of project: <br /> <br />Rick Conner, PE <br />City Manager <br />18070 Collins Avenue <br />Sunny Isles Bch, FL 33160 <br />(305) 792-1928 <br />rconner@sibfl.net <br /> <br />Project Date <br />2008 - Ongoing <br /> <br />Services Provided <br /> <br />Construction Administration <br />Civil Engineering <br />Utility Relocation <br />Roadway Design <br /> <br />Project Manager <br />Sabrina M. Baglieri <br />
The URL can be used to link to this page
Your browser does not support the video tag.