Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />SOLUTIONS <br /> <br />EXISTING PIER SURVEY AND MHWL <br />Sunny Isles Beach, Florida <br /> <br /> <br />~,15~~.~T~;6~~~;:t~,~.. <br /> <br />CGA utilized a leica ScanStation and Global Postioning System with the use of Real Time Kinematic to <br />perform a survey of the existing location to accurately establish that the parameters of the submerged <br />land lease. This was a requirement to ensure that the newly designed pier was being constructed within <br />the State mandated area. CGA also verified environmental monuments such as the Mean High Water Line <br />(MHWl), Erosion Control Line (ECl) and Mean low Water Line (MlWl) for Miami-Dade County <br />Enviornmental Resources Management (DERM) and Florida Department of Environmental Protection <br />(FDEP). Finally, CGA performed a survey of the bottom contours to provide water depth information for <br />the bid documents. This information was integral to the Contractors during the estimating process. <br /> <br />12-4941 Sunny Isles Beach Intracoastal Parks <br /> <br />Client <br />City of Sunny Isles Beach <br /> <br />Contact information <br />at time of project: <br /> <br />Jorge Vera <br />Assistant City Manager <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL <br />33160 <br />(305) 792-1912 <br /> <br />Project Date <br />2010-2011 <br /> <br />Services Provided <br /> <br />Field Locations for <br />Existing Piling <br />Mean High Water Survey <br />Topographic Survey <br />Construction Control <br />Survey <br />Locate Submerged Land <br />Lease and provide CAD <br />file to Architect. <br />Hydrographic Survey <br /> <br />Project Manager <br />Robert Jackson, PSM <br />