Laserfiche WebLink
United Engineering (Structural Engineering) <br /> <br />Deering Estate Weir Glade Rehydration Project, Miami-Dade County, FL <br /> <br />) Project Manager for the design of a weir structure located on the Deering Estate, immediately adjacent <br />to a historic rock bridge. The weir consisted of cast-in-place retaining wall with interchangeable wood <br />panels to allow the owner to vary the amount of water impounded behind the structure. The weir was <br />designed to aesthetically blend in with its surrounding environment. Consideration of construction <br />methods and equipment was required due to the lack of access to the weir location and to minimize <br />the damage to the environment from construction activities. <br /> <br />Pierce Park, Coral Gables, FL <br /> <br />Project Manager for the renovation of existing park that included new playground, perimeter wall, <br />and covered shelter. The covered shelter is an open structure with exposed wood rafters, concrete <br />beams, and masonry columns. Project required innovative hidden connections due to Coral Gables <br />zoning requirements. <br /> <br />Project Caine (MEP) <br /> <br />Sunny Isles Pier, Sunny Isles, FL <br /> <br />The project consisted of the lighting design and plumbing design for the renovation of the Sunny Isles <br />Fishing Pier which is about 635' long. A new white vanilla box restaurant was added to the pier as well <br />as a fish cleaning area. <br /> <br />City of Miami Continuing Services Contract, Miami, FL <br /> <br />Services provided for this contract included Mechanical, Electrical and Plumbing Engineering services. <br />Parks related projects completed under this contract include: <br /> <br />. Gibson Park Pool Upgrades, Miami, FL. The project will consisted of: <br />\ - Replacement of the existing pool DEP filtration system with a sand filtration system. <br />I <br />- Installation of an electric pool heater system <br /> <br />- Modified the pool piping and electrical systems <br /> <br />- Provided the required code improvements (ventilation, ADA, life safety) to the pump room for the <br />completion of items 1 thru 3 above in 2007 for a project cost of $1 million <br /> <br />. Miami Solid Waste Locker Room, Miami, FL. Renovations of existing Locker Rooms. Completed in <br />2008 for a project cost of $1,000,000 <br />. Roberto Clemente Park Building Renovation, Miami Beach, FL. This project consisted of the <br />renovation of the existing recreation center of approximately 10,000 SF. Renovations and updates <br />included the bathrooms to current ADA codes and mechanical ventilation. The HVAC system of the <br />entire facility was updated as well as the lighting. Project completed in 2007 for a project cost of <br />$1M. <br /> <br />Ocean Front Park Lighting, City of Boynton Beach, FL <br />New lighting for a construction cost of $100,000. <br /> <br />CH <br /> <br /> <br />UfQ No, tl-04-04 Deslgll I/IId l'ermiWllg Services ot'lIll! IlllraC/lllstll/l'arks, <br /> <br />."'- <br /> <br /> <br />&ASSOClA ItS <br /> <br />~ <br />