Laserfiche WebLink
<br />The Chappell Group (Enlliranmenta/ Resource Permitting) <br /> <br />Jaco Pastorius Park Phase I Environmental Site Assessment, Oakland Park, FL <br /> <br />) The Chappell Group, Inc. (TCG) was subcontracted by Jacobs Engineering Group, Inc. to perform Phase <br />I Environmental Site Assessment for the City of Oakland Park. The subject site was comprised of a <br />property consisting offour (4) existing vacant parcels located on Dixie Highway and NE 40th Court in the <br />City of Oakland Park, Florida. The objective of a Phase I ESA is to identify recognized environmental <br />~ City ;;f~------'"'=".m conditions associated with the subject <br />r ' .. . ~. <br />~,J OAKLAND PARK property and adjacent properties. TCG <br />I~ ~___ ~o R I I> A '.~ ,:j conducted aerial reviews, site inspections, <br />'I!~ t., and file reviews for hazardous and petroleum <br />contaminants that could have been potential <br />impacts to the soil and groundwater of the <br />subject site. <br /> <br /> <br />Alsdorf Park, Pompano Beach, FL <br /> <br />The Chappell Group, Inc. was subcontracted by Corzo Castella Carballo Thompson Salman (C3TS) for <br />the City of Pompano Beach to prepare conceptual designs for improvements to the existing boat ramp <br />and parking lot on-site. TCG was not only responsible for a bathymetric survey, benthic survey and <br />J,uW,'~lJ;!!..~:~~~H' .f~-;-:-l'!!"~~.;rflt Environmental Assessment, but also for <br />,I . researching the existing permits for the property <br />and providing a summary of the environmental <br />regulatory authorizations that are required for the <br />construction of the proposed conceptual designs. <br />In addition, TCG provided input to C3TS on the <br />feasibility and operation constraints of the <br />proposed park improvements to assist in the <br />development of the conceptual designs and boat <br />ramp improvements. <br /> <br />The Chappell Group, Inc. performed these tasks <br />for C3TS and the City of Pompano Beach from <br />April 2011 to September 2011. <br /> <br /> <br />CH <br /> <br /> <br />L - <br /> <br />&ASSOCIAll'S <br /> <br />i <br />UfQ N/I,ll-t/4-I14Desigll allll l'ermittill9 Services /If tire IIIlraC/lt/slllll'arks <br /> <br />