|
<br />)
<br />
<br />Submitted by Chen Moore and Associates
<br />
<br />~ffi,~~~~p
<br />
<br />President / Electrical Engineer
<br />
<br />Education
<br />
<br />n
<br />
<br />Bachelor of Science in Electrical
<br />Engineering, Villanova University
<br />
<br />Graduate Studies in
<br />Telecommunications, George
<br />Washington University
<br />
<br />Registration
<br />
<br />Professional Engineer - FL and DC
<br />
<br />Professional Affiliations
<br />
<br />Fort Lauderdale Chamber of
<br />Commerce -Trustee
<br />\ Broward Days
<br />Fort Lauderdale Utility Advisory
<br />Committee
<br />Puerto Rico Hotel Association
<br />IESNA(President and formed the
<br />PR section 2003)
<br />~EVmRe':ldy"Brow~rd (Committee
<br />Chairman 2001)
<br />Florida Engineering Society (FES)
<br />AlA
<br />NSPE ..
<br />TMACA (President 1988)
<br />IEEE ~"
<br />Madrid Chamber of Commerce,
<br />AmericanClub'(Madrid 1990)'
<br />
<br />111
<br />
<br />ProjechCaine, Inc.
<br />1948 East Sunrise Blvd,
<br />'Suite 1
<br />Fort Lauderdale, FL33304
<br />Phone: 954',767,8886
<br />~~ ~Fax: 95'"4,767,,9934'
<br />E-fax: 954.337.4665
<br />
<br />Projects includ~ IE of Project Caine's
<br />personnel
<br />
<br />Background
<br />Mr. Caine has a wealth of expertise in his field having over 30 years experience in design and
<br />construction of sophisticated building systems, As President of Project Caine, Inc" he brings
<br />the knowledge of starting and growing branch offices, bringing divisions back to profitability,
<br />developing client loyalty, international experience, and polished presentation skills,
<br />Understanding the need to establish and nurture his client relationships, Mr. Caine prides
<br />himself in being involved from the onset in all of the firm's projects,
<br />
<br />L
<br />
<br />Experience:
<br />Ocean Front Park Lighting, City of Boynton Beach, FL, New lighting for a construction cost of
<br />$100,000,
<br />Sunny Isles Pier, Sunny Isles, FL, The project consisted of the lighting design and plumbing
<br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new white
<br />vanilla box restaurant was added to the pier as well as a fish cleaning area, Completion Date:
<br />2009. Total Project Cost: $400,000
<br />Pioneer Park Lighting, Stuart, FL, New park lighting for a construction cost of $100,000
<br />Jackie Gleason Community Center Upgrades and Renovations, Lauderhill, FL. Upgrades
<br />and renovations to an existing 20,000 SF community center. Services provided included:
<br />Mechanical, Electrical and Plumbing Engineering, Completion Date: 2008 for a project cost of
<br />$1,500,000,
<br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center which
<br />included meeting rooms, gym, game room, offices and bathrooms. The electrical design
<br />included lighting, site lighting, power, fire alarm security and communication systems,
<br />Mechanical design included heating, ventilating, air conditioning and plumbing systems,
<br />City of Miami Continuing Services Contract, Miami, FL Services provided for this contract
<br />included: Mechanical, Electrical and Plumbing Engineering services, Parks Related Projects
<br />completed under this contract include:
<br />. Gibson Park Pool Upgrades, Miami, FL. The project will consisted of:
<br />- Replacement of the existing pool DEP filtration system with a sand filtration system,
<br />- Installation of an electric pool heater system
<br />- Modified the pool piping and electrical systems
<br />Provided the required code improvements (ventilation, ADA, life safety) to the pump
<br />room for the completion of items 1 thru 3 above in 2007 for a project cost of $1
<br />million
<br />. Miami Solid Waste Locker Room, Miami, FL, Renovations of existing Locker Rooms,
<br />Completed in 2008 for a project cost of $1 ,000,000
<br />. Roberto Clemente Park Building Renovation, Miami Beach, FL. This project
<br />consisted of the renovation of the existing recreation center of approximately 10,000 SF,
<br />Renovations and updates included the bathrooms to current ADA codes and mechanical
<br />ventilation, The HVAC system of the entire facility was updated as well as the lighting,
<br />Project completed in 2007 for a project cost of $1 M.
<br />Adult Center Renovations, Hallandale, FL . This project consisted of the renovation of the
<br />Hallandale Adult Center Parking Area and Bus Loop Lighting, Services included electrical
<br />engineering for the design of the new parking lot and road way lighting completed in 2009 for a
<br />project cost of $1 million
<br />
<br />T responsive engineering
<br />
<br />3-31
<br />
|