Laserfiche WebLink
<br />) <br /> <br />Submitted by Chen Moore and Associates <br /> <br />~ffi,~~~~p <br /> <br />President / Electrical Engineer <br /> <br />Education <br /> <br />n <br /> <br />Bachelor of Science in Electrical <br />Engineering, Villanova University <br /> <br />Graduate Studies in <br />Telecommunications, George <br />Washington University <br /> <br />Registration <br /> <br />Professional Engineer - FL and DC <br /> <br />Professional Affiliations <br /> <br />Fort Lauderdale Chamber of <br />Commerce -Trustee <br />\ Broward Days <br />Fort Lauderdale Utility Advisory <br />Committee <br />Puerto Rico Hotel Association <br />IESNA(President and formed the <br />PR section 2003) <br />~EVmRe':ldy"Brow~rd (Committee <br />Chairman 2001) <br />Florida Engineering Society (FES) <br />AlA <br />NSPE .. <br />TMACA (President 1988) <br />IEEE ~" <br />Madrid Chamber of Commerce, <br />AmericanClub'(Madrid 1990)' <br /> <br />111 <br /> <br />ProjechCaine, Inc. <br />1948 East Sunrise Blvd, <br />'Suite 1 <br />Fort Lauderdale, FL33304 <br />Phone: 954',767,8886 <br />~~ ~Fax: 95'"4,767,,9934' <br />E-fax: 954.337.4665 <br /> <br />Projects includ~ IE of Project Caine's <br />personnel <br /> <br />Background <br />Mr. Caine has a wealth of expertise in his field having over 30 years experience in design and <br />construction of sophisticated building systems, As President of Project Caine, Inc" he brings <br />the knowledge of starting and growing branch offices, bringing divisions back to profitability, <br />developing client loyalty, international experience, and polished presentation skills, <br />Understanding the need to establish and nurture his client relationships, Mr. Caine prides <br />himself in being involved from the onset in all of the firm's projects, <br /> <br />L <br /> <br />Experience: <br />Ocean Front Park Lighting, City of Boynton Beach, FL, New lighting for a construction cost of <br />$100,000, <br />Sunny Isles Pier, Sunny Isles, FL, The project consisted of the lighting design and plumbing <br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new white <br />vanilla box restaurant was added to the pier as well as a fish cleaning area, Completion Date: <br />2009. Total Project Cost: $400,000 <br />Pioneer Park Lighting, Stuart, FL, New park lighting for a construction cost of $100,000 <br />Jackie Gleason Community Center Upgrades and Renovations, Lauderhill, FL. Upgrades <br />and renovations to an existing 20,000 SF community center. Services provided included: <br />Mechanical, Electrical and Plumbing Engineering, Completion Date: 2008 for a project cost of <br />$1,500,000, <br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center which <br />included meeting rooms, gym, game room, offices and bathrooms. The electrical design <br />included lighting, site lighting, power, fire alarm security and communication systems, <br />Mechanical design included heating, ventilating, air conditioning and plumbing systems, <br />City of Miami Continuing Services Contract, Miami, FL Services provided for this contract <br />included: Mechanical, Electrical and Plumbing Engineering services, Parks Related Projects <br />completed under this contract include: <br />. Gibson Park Pool Upgrades, Miami, FL. The project will consisted of: <br />- Replacement of the existing pool DEP filtration system with a sand filtration system, <br />- Installation of an electric pool heater system <br />- Modified the pool piping and electrical systems <br />Provided the required code improvements (ventilation, ADA, life safety) to the pump <br />room for the completion of items 1 thru 3 above in 2007 for a project cost of $1 <br />million <br />. Miami Solid Waste Locker Room, Miami, FL, Renovations of existing Locker Rooms, <br />Completed in 2008 for a project cost of $1 ,000,000 <br />. Roberto Clemente Park Building Renovation, Miami Beach, FL. This project <br />consisted of the renovation of the existing recreation center of approximately 10,000 SF, <br />Renovations and updates included the bathrooms to current ADA codes and mechanical <br />ventilation, The HVAC system of the entire facility was updated as well as the lighting, <br />Project completed in 2007 for a project cost of $1 M. <br />Adult Center Renovations, Hallandale, FL . This project consisted of the renovation of the <br />Hallandale Adult Center Parking Area and Bus Loop Lighting, Services included electrical <br />engineering for the design of the new parking lot and road way lighting completed in 2009 for a <br />project cost of $1 million <br /> <br />T responsive engineering <br /> <br />3-31 <br />