Laserfiche WebLink
"\ <br /> <br />Submitted by Chen Moore and Associates <br /> <br />1Rmu~ [HI <br />~m~l~ <br /> <br />, <br /> <br />~ <br /> <br />Education <br />Yale University, B.E. Mechanical <br />Engineering <br />Yale University, B.S. Industrial <br />Administration <br /> <br />Registrations <br /> <br />Professional Engineer, New <br />Jersey <br />Professional Engineer, Florida <br />Professional Engineer, Virginia <br /> <br />Technical Societies <br /> <br />American Society of Heating, <br />Refrigerating and Air Conditioning <br />Engineers, Inc. <br /> <br />\ <br />, <br /> <br />~ <br /> <br />Ie' <br /> <br />." <br /> <br />~ <br /> <br />m <br />g <br />~ II <br /> <br />II ",h, <br /> <br />'Ii <br /> <br />Project Caine, Inc. <br />1948 East Sunrise Blvd. <br />Suite 1 <br />Fort Lauderdale, FL 33304 <br />Phone: 954.767Y8886 <br />'Fax: 954.767.9934 <br />I <br />, E-fax: 954.337.4665 <br /> <br />Projects include IE of Project Caines <br />personnel <br /> <br />Background: <br />Experience in mechanical work includes responsibility for design, field supervision and <br />trouble - shooting of numerous industrial and commercial heating, ventilating and air <br />conditioning installations, ranging from minimum size of 50 tons to installations over 2,000 <br />tons, Other systems include constant temperature - humidity rooms, low temperature rooms <br />and freezers, low temperature rooms, dust collections systems, high pressure piping <br />systems, service piping, process piping and plumbing <br /> <br />Mr, Worthy's background as a test and balance engineer as well as design engineer has led <br />to forensic engineering experience as expert witness for both plaintiff and defense attorneys, <br />Areas of litigation have included piping system corrosion, high humidity's, mold and mildew, <br />pumping deficiencies, condensation and inadequate HVAC capacities. As test and balance <br />consultant for Broward County School System, much work has been done in solving poor <br />IAQ schools, both inadequate ventilation and mold and mildew, <br /> <br />Experience: <br />Ocean Front Park Lighting, City of Boynton Beach, FL, New lighting for a construction cost <br />of $100,000, <br />FlU Recreational Facility, Miami, FL, This project consisted of upgrades and expansion of <br />the existing recreational facility at the FlU Campus, The project included new lighting and <br />HVACs systems for the school's gymnasium where FlU's athletic teams work out. The <br />facility included machines, free weights, Jacuzzi, office areas, a new football coach's office, <br />cardio machines and other activities usually found in a gymnasium. Services included: <br />Mechanical, Electrical, Plumbing and Fire Protection Engineering. <br />Sunny Isles Pier, Sunny Isles, FL, The project consisted of the lighting design and plumbing <br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new <br />white vanilla box restaurant was added to the pier as well as a fish cleaning area, <br />Completion Date: 2009, Total Project Cost: $400,000 <br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center <br />" which included meeting rooms, gym, game room, offices and bathrooms. The electrical <br />, design included lighting, site lighting, power, fire alarm security and communication systems, <br />Mechanical design included heating, ventilating, air conditioning and plumbing systems, <br />, City of Hallandale Adult Center, Hallandale, FL, Electrical design included lighting and <br />power for two soccer fields and one baseball ball field, Lighting was designed to achieve 50 <br />foot-candles on the fields per the city standards, <br />Nanay Community Center Addition, North Miami Beach, FL. The project consisted of the <br />renovation and upgrade of the existing two story community center. Each story is <br />approximately 4,000 SF by adding an additional story and a roof deck, The additional floor <br />included a kitchen, bathrooms, offices, recreational areas and meeting rooms for a project <br />cost of $3 M. <br />Olympus Community Center, Olympus Condominiums, Aventura, FL, This project <br />consisted of the renovation and upgrades to the 24,000 SF Community Center. The facility <br />was on two levels and included meeting space, a kitchen, offices, and bathrooms, The <br />facility had drainage problems that were addressed in the design, Services Provided: <br />Mechanical, Electrical and Plumbing Engineering <br /> <br />3-33 <br />