|
<br />"\
<br />
<br />Submitted by Chen Moore and Associates
<br />
<br />.
<br />
<br />
<br />Education
<br />
<br />Certified in Plumbing Engineering
<br />
<br />Professional Affiliations
<br />
<br />American Society of Plumbing
<br />Engineers
<br />
<br />\
<br />"
<br />
<br />'i:
<br />
<br />w
<br />
<br />1,;
<br />
<br />Sl..'
<br />
<br />Project Caine, Inc.
<br />1948 East Sunrise Blvd.
<br />Suite 1
<br />Fort Lauderdale, FL 33304
<br />Phone: 954.767.8886
<br />11 Fax: 954.767.9934
<br />E-fax: 954.337.4665
<br />
<br />Projects iI/elude IE of Project Cail/e's
<br />persol/I/el
<br />
<br />Background
<br />Mr. Lund has over 27 years of professional experience. His diverse project portfolio includes
<br />educational facilities, medical facilities, office buildings, senior living facilities, airports,
<br />courthouses, and hospitality buildings,
<br />
<br />Experience
<br />Pioneer Park Lighting, Stuart, FL, New park lighting for a construction cost of $1 00,000
<br />FlU Recreational Facility, Miami, FL, This project consisted of upgrades and expansion of the
<br />existing recreational facility at the FlU Campus, The project included new lighting and HVACs
<br />systems for the school's gymnasium where FlU's athletic teams work out. The facility included
<br />machines, free weights, Jacuzzi, office areas, a new football coach's office, cardio machines and
<br />other activities usually found in a gymnasium, Services included: Mechanical, Electrical, Plumbing
<br />and Fire Protection Engineering,
<br />Ocean Front Park Lighting, City of Boynton Beach, FL. New lighting for a construction cost of
<br />$100,000. Jackie Gleason Community Center Upgrades and Renovations. Lauderhill, FL.
<br />Upgrades and renovations to an existing 20,000 SF community center, Services provided
<br />included: Mechanical, Electrical and Plumbing Engineering, Completion Date: 2008 for a project
<br />cost of $1 ,500,000,
<br />Nanay Community Center Addition, North Miami Beach, FL. The project consisted of the
<br />renovation and upgrade of the existing two story community center, Each story is approximately
<br />4,000 SF by adding an additional story and a roof deck, The additional floor included a kitchen,
<br />bathrooms, offices, recreational areas and meeting rooms for a project cost of $3 M.
<br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center which
<br />included meeting rooms, gym, game room, offices and bathrooms, The electrical design included
<br />lighting, site lighting, power, fire alarm security and communication systems, Mechanical design
<br />included heating, ventilating, air conditioning and plumbing systems,
<br />Sunny Isles Pier, Sunny Isles, FL, The project consisted of the lighting design and plumbing
<br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new white
<br />vanilla box restaurant was added to the pier as well as a fish cleaning area. Completion Date:
<br />2009, Total Project Cost: $400,000
<br />City of Miami Continuing Services Contract. Miami, FL Services provided for this contract
<br />included: Mechanical, Electrical and Plumbing Engineering services, Parks Related Projects
<br />, completed under this contract include:
<br />. Gibson Park Pool Upgrades, Miami, FL. The project will consisted of:
<br />- Replacement of the existing pool DEP filtration system with a sand filtration system.
<br />- Installation of an electric pool heater system
<br />- Modified the pool piping and electrical systems
<br />Provided the required code improvements (ventilation, ADA, life safety) to the pump
<br />room for the completion of items 1 thru 3 above in 2007 for a project cost of $1
<br />million
<br />. Miami Solid Waste Locker Room, Miami, FL, Renovations of existing Locker Rooms,
<br />Completed in 2008 for a project cost of $1 ,000,000
<br />OIympus Community Center, Olympus Condominiums, Aventura, FL, This project consisted of
<br />the renovation and upgrades to the 24,000 SF Community Center. The facility was on two levels
<br />and included meeting space, a kitchen, offices, and bathrooms, The facility had drainage problems
<br />that were addressed in the design, Services Provided: Mechanical, Electrical and Plumbing
<br />Engineering
<br />
<br />T responsive engineering
<br />
<br />3-35
<br />
|