Laserfiche WebLink
<br />"\ <br /> <br />Submitted by Chen Moore and Associates <br /> <br />. <br /> <br /> <br />Education <br /> <br />Certified in Plumbing Engineering <br /> <br />Professional Affiliations <br /> <br />American Society of Plumbing <br />Engineers <br /> <br />\ <br />" <br /> <br />'i: <br /> <br />w <br /> <br />1,; <br /> <br />Sl..' <br /> <br />Project Caine, Inc. <br />1948 East Sunrise Blvd. <br />Suite 1 <br />Fort Lauderdale, FL 33304 <br />Phone: 954.767.8886 <br />11 Fax: 954.767.9934 <br />E-fax: 954.337.4665 <br /> <br />Projects iI/elude IE of Project Cail/e's <br />persol/I/el <br /> <br />Background <br />Mr. Lund has over 27 years of professional experience. His diverse project portfolio includes <br />educational facilities, medical facilities, office buildings, senior living facilities, airports, <br />courthouses, and hospitality buildings, <br /> <br />Experience <br />Pioneer Park Lighting, Stuart, FL, New park lighting for a construction cost of $1 00,000 <br />FlU Recreational Facility, Miami, FL, This project consisted of upgrades and expansion of the <br />existing recreational facility at the FlU Campus, The project included new lighting and HVACs <br />systems for the school's gymnasium where FlU's athletic teams work out. The facility included <br />machines, free weights, Jacuzzi, office areas, a new football coach's office, cardio machines and <br />other activities usually found in a gymnasium, Services included: Mechanical, Electrical, Plumbing <br />and Fire Protection Engineering, <br />Ocean Front Park Lighting, City of Boynton Beach, FL. New lighting for a construction cost of <br />$100,000. Jackie Gleason Community Center Upgrades and Renovations. Lauderhill, FL. <br />Upgrades and renovations to an existing 20,000 SF community center, Services provided <br />included: Mechanical, Electrical and Plumbing Engineering, Completion Date: 2008 for a project <br />cost of $1 ,500,000, <br />Nanay Community Center Addition, North Miami Beach, FL. The project consisted of the <br />renovation and upgrade of the existing two story community center, Each story is approximately <br />4,000 SF by adding an additional story and a roof deck, The additional floor included a kitchen, <br />bathrooms, offices, recreational areas and meeting rooms for a project cost of $3 M. <br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center which <br />included meeting rooms, gym, game room, offices and bathrooms, The electrical design included <br />lighting, site lighting, power, fire alarm security and communication systems, Mechanical design <br />included heating, ventilating, air conditioning and plumbing systems, <br />Sunny Isles Pier, Sunny Isles, FL, The project consisted of the lighting design and plumbing <br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new white <br />vanilla box restaurant was added to the pier as well as a fish cleaning area. Completion Date: <br />2009, Total Project Cost: $400,000 <br />City of Miami Continuing Services Contract. Miami, FL Services provided for this contract <br />included: Mechanical, Electrical and Plumbing Engineering services, Parks Related Projects <br />, completed under this contract include: <br />. Gibson Park Pool Upgrades, Miami, FL. The project will consisted of: <br />- Replacement of the existing pool DEP filtration system with a sand filtration system. <br />- Installation of an electric pool heater system <br />- Modified the pool piping and electrical systems <br />Provided the required code improvements (ventilation, ADA, life safety) to the pump <br />room for the completion of items 1 thru 3 above in 2007 for a project cost of $1 <br />million <br />. Miami Solid Waste Locker Room, Miami, FL, Renovations of existing Locker Rooms, <br />Completed in 2008 for a project cost of $1 ,000,000 <br />OIympus Community Center, Olympus Condominiums, Aventura, FL, This project consisted of <br />the renovation and upgrades to the 24,000 SF Community Center. The facility was on two levels <br />and included meeting space, a kitchen, offices, and bathrooms, The facility had drainage problems <br />that were addressed in the design, Services Provided: Mechanical, Electrical and Plumbing <br />Engineering <br /> <br />T responsive engineering <br /> <br />3-35 <br />