<br />Sadkin Community Center, Lauderhill, FL. The project is a two story existing Community Center with approximately 6,800 SF per floor, The
<br />existing roof top units will be replaced and only selected areas will be renovated, Most of the first floor ceiling will be replaced, new lighting will
<br />be provided as well as new ductwork will be provided, Services provided included: Mechanical, Electrical, Plumbing and Fire Protection
<br />Engineering, Project completed in 2009 for a project cost of $1 ,000,000,
<br />City of Hallandale Adult Center, Hallandale, FL, Electrical design included lighting and power for two soccer fields and one baseball ball field,
<br />Lighting was designed to achieve 50 foot-candles on the fields per the city standards,
<br />Adult Center Renovations, Hallandale, FL , This project consisted of the renovation of the Hallandale Adult Center Parking Area and Bus
<br />Loop Lighting, Services included electrical engineering for the design of the new parking lot and road way lighting completed in 2009 for a
<br />project cost of $1 million
<br />
<br />Experience with continuing services contacts includes:
<br />
<br />FAU Continuing Engineering Services Contract, Boca Raton, FL, Project Caine, Inc. provided MEP services on numerous small renovation
<br />projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc.., Project
<br />Caine, Inc. was recently awarded a second continuing services contract with FAU to provide MEP services.
<br />
<br />Pompano Beach Continuing Services Contract, Pompano Beach, FL, Project Caine, Inc. is providing MEP services under this continuing
<br />services contract which consists of various miscellaneous engineering projects. Projects under this contract to date have included: Pumping
<br />Station #65, Pumping Station #81, Hillsboro Marina and Pompano Beach New Main Library,
<br />
<br />Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL, As part of the Parson's team for the continuing services
<br />contract at the airport for construction management, Project Caine, Inc. provided MEP services on numerous projects,
<br />
<br />'I3roward County Continuing Services Contract, Broward County, FL, Project Caine, Inc. has been working with Singer Architects and BHA
<br />'Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office
<br />renovations, escalator upgrades, and an emergency system upgrade to the County Courthouse,
<br />
<br />FlU Continuing Services Contract, Miami, FL, Project Caine, Inc. provided MEP services on numerous small renovations at the university
<br />which included laboratories, gymnasiums, offices and classrooms,