Laserfiche WebLink
Submitted by Chen Moore and Associates <br /> <br />~~o~ <br />I~I'~ <br /> <br /> <br />~ <br /> <br />Education <br /> <br />GMI Engineering & Management <br />Institute <br /> <br />Professional Affiliations <br /> <br />IEEE, Computer Society, 2001 <br /> <br />\ <br />I <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />Project Caine, Inc. <br />1948 East Sunrise Blvd. <br />Suite 1 <br />Fort Lauderdale, FL 33304 <br />~Phone: 954.767.8886 <br />\ Fax: 954.767.9934 <br />E-fax: 954.337.4665 <br /> <br />Projects include IE of Project Caine's <br />personnel <br /> <br />r" <br /> <br />Background: <br />Ms Willis has over 15 years experience designing electrical, lighting, security, and voice and data <br />systems for various facilities such as: residential, healthcare, university, airport and ports, <br /> <br />Experience: <br /> <br />~ <br /> <br />Ocean Front Park Lighting, City of Boynton Beach, FL. New lighting for a construction cost of <br />$100,000, City of Hallandale Adult Center, Hallandale, FL, Electrical design included lighting <br />and power for two soccer fields and one baseball ball field, Lighting was designed to achieve 50 <br />foot-candles on the fields per the city standards, <br />FlU Recreational Facility, Miami, FL. This project consisted of upgrades and expansion of the <br />existing recreational facility at the FlU Campus, The project included new lighting and HVACs <br />systems for the school's gymnasium where FlU's athletic teams work out. The facility included <br />machines, free weights, Jacuzzi, office areas, a new football coach's office, cardio machines and <br />other activities usually found in a gymnasium, Services included: Mechanical, Electrical, <br />Plumbing and Fire Protection Engineering, <br />Sunny Isles Pier, Sunny Isles, FL. The project consisted of the lighting design and plumbing <br />design for the renovation of the Sunny Isles Fishing Pier which is about 635' long, A new white <br />vanilla box restaurant was added to the pier as well as a fish cleaning area. Completion Date: <br />2009, Total Project Cost: $400,000 ' <br />Adult Center Renovations, Hallandale, FL . This project consisted of the renovation of the <br />Hallandale Adult Center Parking Area and Bus Loop Lighting, Services included electrical <br />engineering for the design of the new parking lot and road way lighting completed in 2009 for a <br />project cost of $1 million <br />Jackie Gleason Community Center Upgrades and Renovations, Lauderhill, FL, Upgrades <br />and renovations to an existing 20,000 SF community center. Services provided included: <br />Mechanical, Electrical and Plumbing Engineering, Completion Date: 2008 for a project cost of <br />$1,500,000, <br />Westwind Community Center, Fort Lauderdale, FL. New 6,000 SF Community Center which <br />included meeting rooms, gym, game room, offices and bathrooms. The electrical design included <br />lighting, site lighting, power, fire alarm security and communication systems, Mechanical design <br />included heating, ventilating, air conditioning and plumbing systems, <br />Sadkin Community Center, Lauderhill, FL, The project is a two story existing Community Center <br />with approximately 6,800 SF per floor, The existing roof top units will be replaced and only <br />selected areas will be renovated, Most of the first floor ceiling will be replaced, new lighting will <br />be provided as well as new ductwork will be provided. Services provided included: Mechanical, <br />Electrical, Plumbing and Fire Protection Engineering, Project completed in 2009 for a project cost <br />of $1 ,000,000, <br />Nanay Community Center Addition, North Miami Beach, FL, The project consisted of the <br />renovation and upgrade of the existing two story community center. Each story is approximately <br />4,000 SF by adding an additional story and a roof deck. The additional floor included a kitchen, <br />bathrooms, offices, recreational areas and meeting rooms for a project cost of $3 M, <br />Olympus Community Center, Olympus Condominiums, Aventura, FL, This project consisted of <br />the renovation and upgrades to the 24,000 SF Community Center. The facility was on two levels <br />and included meeting space, a kitchen, offices, and bathrooms. The facility had drainage <br />problems that were addressed in the design, Services Provided: Mechanical, Electrical and <br />Plumbing Engineering <br /> <br />~ <br />'" it <br />; <br /> <br />~ <br /> <br />3-37 <br />