Laserfiche WebLink
<br />Submitted by Chen Moore and Associates <br /> <br />) <br /> <br />Victoria N. Willis <br />Electrical Designer <br />Page 2 <br /> <br />City of Miami Continuing Services Contract, Miami, FL Services provided for this contract included: Mechanical, Electrical and Plumbing <br />Engineering services, Parks Related Projects completed under this contract include: <br />. Gibson Park Pool Upgrades, Miami, FL, The project will consisted of: <br />- Replacement of the existing pool DEP filtration system with a sand filtration system, <br />- Installation of an electric pool heater system <br />- Modified the pool piping and electrical systems <br />- Provided the required code improvements (ventilation, ADA, life safety) to the pump room for the completion of items 1 thru 3 <br />above in 2007 for a project cost of $1 million <br />. Miami Solid Waste Locker Room, Miami, FL, Renovations of existing Locker Rooms, Completed in 2008 for a project cost of <br />$1,000,000 <br />. Roberto Clemente Park Building Renovation, Miami Beach, FL. This project consisted of the renovation of the existing recreation <br />center of approximately 10,000 SF, Renovations and updates included the bathrooms to current ADA codes and mechanical <br />ventilation, The HVAC system of the entire facility was updated as well as the lighting, Project completed in 2007 for a project cost of <br />$1M, <br /> <br />Experience with continuing services contacts includes: <br /> <br />FlU Continuing Services Contract, Miami, FL, Project Caine, Inc. provided MEP services on numerous small renovations at the university <br />which included laboratories, gymnasiums, offices and classrooms, <br /> <br />Pompano Beach Continuing Services Contract, Pompano Beach, FL, Project Caine, Inc. is providing MEP services under this continuing <br />services contract which consists of various miscellaneous engineering projects, Projects under this contract to date have included: Pumping <br />Station #65, Pumping Station #81, Hillsboro Marina and Pompano Beach New Main Library, <br />) <br />Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL, As part of the Parson's team for the continuing services <br />contract at the airport for construction management, Project Caine, Inc. provided MEP services on numerous projects, <br /> <br />Broward County Continuing Services Contract, Broward County, FL, Project Caine, Inc. has been working with Singer Architects and BHA <br />Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years, Projects include office <br />renovations, escalator upgrades, and an emergency system upgrade to the County Courthouse, <br /> <br />FAU Continuing Engineering Services Contract, Boca Raton, FL. Project Caine, Inc. provided MEP services on numerous small renovation <br />projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc.., Project <br />Caine, Inc. was recently awarded a second continuing services contract with FAU to provide MEP services, <br /> <br />3-38 <br />