My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Savino & Miller Design Studio
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Savino & Miller Design Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:52:54 PM
Creation date
5/7/2012 2:49:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />l <br /> <br />r <br /> <br />.:...: <br /> <br />J <br /> <br />savincmiller <br /> <br />DES G N STUDIO <br /> <br />LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE <br /> <br /> <br />STREETSCAPES <br />41 ST STREET MIDDLE BEACH <br />BEAUTIFICATION PROJECT <br /> <br />The design concept is based on the importance of 41 st Street as a diverse <br />eommunity eenter and major gateway into the heart of Miami Beach. The goal <br />was to transform the street into a tropical eosmopolitan "boulevard," based on <br />41 st Street's unique geographic location and partieular functions. The design <br />called for a sequence of spatial experiences, or "events," which were linked <br />together by Royal Palms, flowering shrubs, and groundcovers. A landscape <br />median was proposed for the length of the street, with new decorative paving for <br />all sidewalks. A major element of the plan was the redesign of the Indian Creek <br />Bridge, calling for wider sidewalks, benches, planters, and a pavilion lighthouse, <br />acting as a gateway to the street. <br /> <br />Location: Miami Beach, FL <br />Serviee: Master Plan, Schematic Plans, Design Development, <br />Construction Administration <br />Principal Firm: Consul-Tech Engineering <br />Date: 2005 <br />Project Cost: $4,200,000 <br />Client: City of Miami Beach <br />Contact Info: George Gomez 305.673.7071 <br />Principal in-eharge: Barry Miller & Adriana Savino <br /> <br /> <br />32J <br />
The URL can be used to link to this page
Your browser does not support the video tag.