Laserfiche WebLink
<br />) <br />) <br />) <br />} <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />.::..J <br /> <br />savincmiller <br /> <br />DES GN STUDIO <br /> <br /> <br />COMMERCIAL <br />MIAMI BEACH MULTI-PURPOSE <br />PARKING FACILITY <br /> <br />The Miami Beaeh Multi-Purpose Parking Facility is an urban infill project located <br />next to the City Hall along Meridian Avenue. Our Landscape Master Plan links <br />the City Hall with the new facility and an existing ancillary office building along <br />17th Street. These buildings form a corner open space at Meridian and 17th <br />Street. The space, now a new plaza, was re-designed as an urban shady oasis <br />that acts as an entry courtyard to the existing office building and the new multi- <br />purpose parking facility. <br /> <br />Location: Miami Beach, FL <br />Service: Master Plan, Schematic Design through Construction Phase <br />Serviees <br />Principal Firm: Perkins + Will <br />Date: 2011 <br />Project Cost: $550,000 <br />Client: City 01 Miami Beach <br />Client Info: Jose Gelabert-Navia 305.569.1333 <br />Principal in-charge: Barry Miller <br /> <br /> <br />311 <br />