Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />1" 1 <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />:'; " <br />"'~'_S;'_- ", _ . .-.-; ','.~_ ~"_ ,t,__ ',,' '_ 'l..' 'i'~"- ,;'~ <br />{~E t;~XfAi~fIi.',E~ffER)D~'N,e,l~.: . <br /> <br />PROJECT NAME: A.D. Barnes Park <br />New Walkways and <br />Parking Lot <br /> <br />CLIENT'S NAME: Miami-Dade County <br />Park & Recreation <br />Department <br />Mr. Pedro Nunez <br />TYPE OF FACILITY Linear Park with <br />OR SERVICES: Walkways and Parking <br />Lot. <br /> <br />SRS PROJECT FEE: $16,813 <br /> <br />COMPLETION DATE: January 2007 <br /> <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Jean-Claude Fontaneau <br /> <br />PROJECT DESCRIPTION: <br /> <br />SRS provided the engineering design, permitting <br />and construction phase services of a walkway and <br />bike path and parking lot. The project is located <br />within A.D. Barnes Park along the Coral Gables <br />Canal. The work included the geometric design of <br />the walkways/bike paths and parking lot, design <br />site paving, grading, and drainage plans, <br />Coordinating the work of subconsultants including <br />Surveyors, Geotechnical, electrical site lighting <br />and Landscaping. Our scope of work also included <br />preparing and submitting permit applications and <br />construction plans for "dry-run" and "final" review <br />by local regulatory agencies including Miami-Dade <br />County Building Department, Miami-Dade Public <br />Works Dept., and DERM. <br /> <br />Construction Phase services included weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing periodic <br />construction observations, and preparing close- <br />out documents. <br /> <br /> <br /> <br />~~- <br /> <br /> <br />ENGINEERING,INC. <br />