|
<br />)
<br />
<br />.,
<br />)
<br />
<br />)
<br />
<br />A-",\
<br />i
<br />'\,
<br />.
<br />
<br />
<br />
<br />Ignacio Serralta, P.E.
<br />Principal
<br />
<br />s-:~~s./~::.~", , .,.'~~~,4'~':; ,l':_'- ~",,' '~~[;>~t'f~;):~~:~;-:k:~~:'! t..;.4J -,,~l~~l:~
<br />
<br />)
<br />)
<br />)
<br />'4
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />
<br />J
<br />
<br />)
<br />)
<br />,)
<br />')
<br />
<br />
<br />Mr, Ignacio Serralta has more than eighteen years of experience in civil
<br />engineering planning, design, and management for a wide range of public
<br />works, site development, and infrastructure projects, He has been
<br />responsible for the design of roadway improvements, storm drainage
<br />systems, water and sanitary sewers transmission pipelines, as well as
<br />reservoirs and pump stations. He is familiar with the many facets of public
<br />and private project management and has served as Project
<br />Manager/Engineer on many projects.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />
<br />Mr. Ignacio Serralta's major recent responsibilities include:
<br />
<br />. Principal-in-charge for the engineering design, permitting and construction phase services for
<br />Chapman Field Park, The project included a pedestrian/bike path, access road, bridge, parking
<br />area, and canoe ramp. The work included the geometric design of the pedestrian/bike paths and
<br />parking lot, design site paving, grading, and drainage plans, and pavement marking and signage
<br />plans. Coordinating the work with other subconsultants including Surveyors, Geotechnical,
<br />Structural Engineers and environmental consultants. Construction Phase services included weekly
<br />construction meetings, reviewing shop drawings, responding to RFI's, providing periodic
<br />construction observations, and preparing close-out documents.
<br />
<br />. Principal-in-charge for the design, permitting and construction phase services for A.D. Barnes Park
<br />along the Coral Gables Canal. The project included the geometric design of the walkways/bike
<br />paths and parking lot, design site paving, grading, and drainage plans, Coordinating the work of
<br />subconsultants including Surveyors, Geotechnical, electrical site lighting and Landscaping, The
<br />scope of work also included preparing and submitting permit applications and construction plans for
<br />"dry-run" and "final" review by local regulatory agencies including Miami-Dade County Building
<br />Department, Miami-Dade Public Works Dept., and DERM; and construction phase services
<br />included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing
<br />periodic construction observations, and preparing close-out documents,
<br />
<br />. Principal-in-charge for the design, permitting and construction phase services for Three Lakes
<br />Park. This project included the design of site utilities, parking area, building site, play field, access
<br />road, and walkways, This work included the design of 12" water main extension, gravity sewer
<br />main extension, paving, grading, and drainage plans for a 680 L.F. of access road and a 97 cars
<br />parking lot. Our scope of work also included preparing and submitting water service agreement,
<br />DEP applications and construction plans for "dry-run" and "final" review by local regulatory
<br />agencies including Miami-Dade County Building Department, MDWASD, Miami-Dade Public Works
<br />Dept., Miami-Dade Fire Dept., DERM, and State of Florida Health Department.
<br />
<br />. Principal-in-charge for the design and construction phase services for new sewer systems to serve
<br />the Crandon Golf Course and the Crandon Park Marina. These projects involved the design of
<br />approximately 1,900 LF gravity sewer mains and two sewer pump stations. Work also included
<br />abandoning the existing septic tanks and drain fields and obtaining permits from DEP, DERM and
<br />the Building Department. Construction Phase services included weekly construction meetings,
<br />reviewing shop drawings, responding to RFl's, providing continuous off-site construction
<br />observations, and preparing close-out documents
<br />
<br />
|