My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. - Traffic & Transportation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano & Assoc. - Traffic & Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2012 10:27:20 AM
Creation date
5/21/2012 10:24:06 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs.
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br />E % C E F 7 1 0 N A L S O L U i 1 0 N S <br />i <br />9 <br />TOWN -WIDE NEIGHBORHOOD TRAFFIC CALMING <br />Surfside, Florida <br />mokm <br />Client <br />Town of Surfside <br />Contact information <br />at time of project: <br />Roger M. Carlton <br />Town Manager <br />9293 Harding Avenue <br />Surfside, Florida 33154 <br />(305) 861 -4863 <br />Project Date <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />As the Town's traffic engineering consultant, CGA conducted a town -wide traffic Bryan Kelley, PE <br />analysis to determine appropriate neighborhood traffic mitigation measures. The <br />analysis included conversion of two -way stop control intersections to four -way <br />stop control, installation of speed tables and the conversion of two -way roadway <br />segments to one -way operation. <br />2009 <br />Services Provided <br />Traffic Engineering <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />The analysis included the development of a comprehensive traffic flow model to <br />determine the impacts of proposed traffic calming measures. CGA also provided <br />extensive public outreach and coordination between citizen groups and Town <br />staff. <br />Consultant Cost <br />$100,000 <br />TE 0027 SurfsideTrafficCalming I Page 2113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.