Calvin, Giordano & Associates, Inc.
<br />l
<br />E X C E P T 1 0 N A L S 0 L U T 1 0 N S
<br />t � i
<br />James E. Spinks, PE, PTOE, Page 4
<br />Districtwide Corridor Planning Studies, FDOT District VI Planning Office, Miami, Florida. Mr. Spinks
<br />provided on -site consultant services for developed planning and engineering products for numerous
<br />Program activities, PD &E studies and PLEMO studies of the Planning Office Corridors Team. He served as
<br />FDOT representative with the maintenance and development of improvements along the Florida Keys
<br />Heritage Trail in cooperation with Monroe County officials and various city representatives within Monroe
<br />County.
<br />SR- 968 /Flagler Street from SR -826 to SR- 969 /Milam Dairy Road, Arterial Analysis, Miami, Florida.
<br />Mr. Spinks served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations
<br />Office which identified improvements for this urban corridor. The study included analyzing Department
<br />crash data, performing traffic operational analysis, developing alternative improvements compliant with
<br />current access management standards and guidelines to reduce crash patterns, and performing
<br />benefit /cost analysis of each alternative.
<br />SR- 916 /Opa -locka Boulevard at NW 2 Avenue, Intersection Analysis, Miami, Florida. Mr. Spinks
<br />j served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations Office which
<br />identified improvements for this intersection. The study included data collection, analyzing Department
<br />crash data, identifying crash patterns, performing traffic operational analysis, developing alternative
<br />j improvements to reduce crash patterns, and performing benefit /cost analysis of each alternative.
<br />Districtwide Safety Contract, FDOT District Four Traffic Operations Office, Ft. Lauderdale, Florida.
<br />Mr. Spinks performed multiple traffic engineering studies including Qualitative Assessments, Intersection
<br />Analysis, Left Turn Warrants, Signal Warrants, Arterial Analysis, Corridor Evaluations, Travel Time and
<br />Delay Studies.
<br />Palm Beach County Traffic Division. Mr. Spinks was responsible for countywide signalization of new
<br />intersections, designing new intersections, and modifying existing intersections. He supervised Engineering
<br />Assistants and CADD Technicians. He participated in design, construction, modification, and maintenance
<br />related activities of existing and future roadway intersections.
<br />ERM Technologies, Inc., St. Louis, MO (2/1999- 1/2000), Project Engineer I. As Owner's representative
<br />for project management and contract coordination of multiple projects totaling over $5 million, Mr. Spinks
<br />oversaw construction including interceptor /outfall structures and pipe installations for MSD. He was also
<br />responsible for contract documentation, project scheduling, and job progress meetings.
<br />U.S. Army Corps of Engineers, St. Louis District, St. Louis, MO - Student Intern (5/1994- 11/1998).
<br />Mr. Spinks oversaw project sites for several construction sites representing the U.S. Army Corps of
<br />Engineers as a Quality Assurance Representative with project amounts exceeding $3 million. Projects
<br />included the construction of a pump station, multiple gate well structures, over 4 miles of levee and Lock
<br />and Dam No. 26 - I -Wall Removal.