Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />l <br />E X C E P T 1 0 N A L S 0 L U T 1 0 N S <br />t � i <br />James E. Spinks, PE, PTOE, Page 4 <br />Districtwide Corridor Planning Studies, FDOT District VI Planning Office, Miami, Florida. Mr. Spinks <br />provided on -site consultant services for developed planning and engineering products for numerous <br />Program activities, PD &E studies and PLEMO studies of the Planning Office Corridors Team. He served as <br />FDOT representative with the maintenance and development of improvements along the Florida Keys <br />Heritage Trail in cooperation with Monroe County officials and various city representatives within Monroe <br />County. <br />SR- 968 /Flagler Street from SR -826 to SR- 969 /Milam Dairy Road, Arterial Analysis, Miami, Florida. <br />Mr. Spinks served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations <br />Office which identified improvements for this urban corridor. The study included analyzing Department <br />crash data, performing traffic operational analysis, developing alternative improvements compliant with <br />current access management standards and guidelines to reduce crash patterns, and performing <br />benefit /cost analysis of each alternative. <br />SR- 916 /Opa -locka Boulevard at NW 2 Avenue, Intersection Analysis, Miami, Florida. Mr. Spinks <br />j served as Project Engineer for this study conducted for the FDOT District VI Traffic Operations Office which <br />identified improvements for this intersection. The study included data collection, analyzing Department <br />crash data, identifying crash patterns, performing traffic operational analysis, developing alternative <br />j improvements to reduce crash patterns, and performing benefit /cost analysis of each alternative. <br />Districtwide Safety Contract, FDOT District Four Traffic Operations Office, Ft. Lauderdale, Florida. <br />Mr. Spinks performed multiple traffic engineering studies including Qualitative Assessments, Intersection <br />Analysis, Left Turn Warrants, Signal Warrants, Arterial Analysis, Corridor Evaluations, Travel Time and <br />Delay Studies. <br />Palm Beach County Traffic Division. Mr. Spinks was responsible for countywide signalization of new <br />intersections, designing new intersections, and modifying existing intersections. He supervised Engineering <br />Assistants and CADD Technicians. He participated in design, construction, modification, and maintenance <br />related activities of existing and future roadway intersections. <br />ERM Technologies, Inc., St. Louis, MO (2/1999- 1/2000), Project Engineer I. As Owner's representative <br />for project management and contract coordination of multiple projects totaling over $5 million, Mr. Spinks <br />oversaw construction including interceptor /outfall structures and pipe installations for MSD. He was also <br />responsible for contract documentation, project scheduling, and job progress meetings. <br />U.S. Army Corps of Engineers, St. Louis District, St. Louis, MO - Student Intern (5/1994- 11/1998). <br />Mr. Spinks oversaw project sites for several construction sites representing the U.S. Army Corps of <br />Engineers as a Quality Assurance Representative with project amounts exceeding $3 million. Projects <br />included the construction of a pump station, multiple gate well structures, over 4 miles of levee and Lock <br />and Dam No. 26 - I -Wall Removal. <br />Page 3112 <br />