My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. - Traffic & Transportation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano & Assoc. - Traffic & Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2012 10:27:20 AM
Creation date
5/21/2012 10:24:06 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs.
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br />E% C E P T 1 0 N A L S 0 L LI T 1 0 N 5 <br />Bryan Kelley, PE, Page 2 <br />SR 80 Access Control Plan in the Vicinity of Loxahatchee Groves, Palm Beach County, Florida. Mr. <br />Kelley designed an access management plan of SR 80 in the vicinity of Loxahatchee Groves. The project <br />limits included many of the local roadways located within the Town of Loxahatchee Groves. The project <br />included projecting future development and traffic within the area as well as intersection operational <br />analysis. <br />International Harbor, Riviera Beach, Florida. Mr. Kelley performed shared parking analysis for a private <br />developer utilizing the Urban Land Institute's Shared Parking Handbook. Additionally, Mr. Kelley has <br />provided queuing analysis and traffic engineering recommendations regarding driveways and turn lane <br />requirements. Project is currently on- going. <br />Foundation Park Boulevard Extension Feasibility Study, Malabar, Florida. Prepared a feasibility study <br />for the extension of Foundation Park Boulevard located in the Town of Malabar. The scope of the project <br />included trip generation, trip assignment, and microscopic traffic simulation. A final report was prepared <br />that also included recommendations for the ultimate right- of-way and roadway cross section necessary to <br />accommodate the future commercial development in the area. <br />Bonaventure Boulevard Roundabouts Safety Study, Weston, Florida. Mr. Kelley performed a safety <br />study for the conversion of the intersections of Bonaventure Boulevard at Saddle Club Road and Blatt <br />Boulevard from all way stop control to roundabouts. The project consisted of traffic operational analysis, <br />crash analysis, and benefit cost analysis for both the existing and future conditions. <br />Hiatus Road Safety Study, Cooper City, Florida. Mr. Kelley performed a safety study for the intersection <br />of Hiatus Road at SW 551h Street located in Cooper City, Florida. The project consisted of analyzing crash <br />data, traffic volumes, and speed data. Several different mitigation and traffic calming measures were <br />identified as a result of the analysis. Recommendations including the advantages and disadvantages of <br />each mitigation alternative along with a general preliminary cost estimate were presented to the City. <br />Waterview Traffic Study, Miramar, Florida. Prepared a traffic impact study for the proposed Waterview <br />development to address access concerns along Douglas Road. The proposed development consisted of <br />converting an existing on -site golf course into 304 single family homes and 320 apartment units. The <br />report included existing and future traffic operational analysis, sight distance issues, and roadway <br />mitigation improvements for the proposed development. <br />Page 3116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.