Laserfiche WebLink
Calvin, Giordano & Associates, hic. <br />1 E X C E P T 1 O N A L S O L U T 1 0 N S <br />- "�� , I <br />A <br />Robert Jackson, PSM, Page 2 <br />City of Pembroke Pine Boundary survey for a 167 -acre parcel, Broward County, Florida. In addition <br />to the information provided by the client, research was required for adjoining ownerships and right -of -way <br />maps for 1 -75 corridor as well. The survey was accomplished using and overall static GPS traverse that <br />included sectional work along with conventional sub - traverses utilized for finding or setting property <br />corners and locating improvements. At the completion of the AUTOCAD drawing all aspects of the project <br />were reviewed for completeness and compliance with Minimum Technical Standards (MTS). <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey which delineated <br />mean high water along the Dania Cut -Off Canal. All in accordance with the State of Florida minimum <br />technical standards for land surveys as defined by Chapter 5J -17.05 of the Florida Administrative Code. <br />City of Lauderhill, Florida, Storm Water locations -GPS: Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br />City of Weston, Florida, Sign Inventory -GPS (City of Weston Surveyor): Project Manager responsible <br />for all survey aspects of this project. Project involved locations of City signage. This included informational <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br />weekly meetings to assure the project was on time and on budget. <br />City of Weston, Florida, Storm Water Improvements -GPS: Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br />Page 3130 <br />