Laserfiche WebLink
RELEVANT EXPERIENCE <br />PROJECT NAME: NW 138th Street <br />CLIENT'S NAME: City of Hialeah <br />Streets Department <br />Mr. Jorge Hernandez <br />305 - 687 -2611 <br />TYPE OF FACILITY Roadway & Drainage <br />OR SERVICES: Improvements <br />NW 138th Street <br />Widening <br />SRS PROJECT FEE: $417,374 <br />COMPLETION DATE: March 2007 to <br />December 2008 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Oliverio Sanchez, P.E. <br />Jean - Claude Fontaneau <br />ra:X0J1 - � LoIi7: �*19ti# 1?r <br />SRS was responsible for the engineering design, <br />preparation of construction documents, plans permitting <br />(Miami -Dade County Public Works, DERM, SFWMD, & <br />FDOT), pre- construction phase support services to the <br />City of Hialeah for the construction of NW 138th Street <br />between 1 -75 and N.W. 107th Avenue. The work includes <br />the preparation of designs for the construction of <br />drainage improvements, street lighting and signalization, <br />together with the design of a new 50' wide canal <br />including culverts and a canal wall along the north side of <br />NW 138 h Street between NW 97th Avenue and 1 -75. The <br />new design includes a 6 -lane divided roadway, double <br />left turns and deceleration lanes, and signalized <br />intersections at NW 97th Avenue, NW 102nd Avenue, and <br />NW 107th Avenue. Estimated Construction Cost <br />$12,450,000. <br />Construction administration support and inspection <br />services during the construction including review shop <br />drawings, respond to RFls, review payment request, <br />conduct periodic inspections, and engineer certifications <br />�V A <br />