My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2012 10:22:41 AM
Creation date
5/22/2012 10:18:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />- A <br />PROJECT NAME: Various Hialeah <br />Roadway Projects <br />CLIENT'S NAME: City of Hialeah <br />Streets Department <br />Mr. Jorge Hernandez <br />(305) 687 -2611 <br />TYPE OF FACILITY Hialeah Roadway and <br />OR SERVICES: Drainage Improvements <br />SRS PROJECT FEE: $3,618,168 <br />COMPLETION DATE: 2001 thru 2010 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Oliverio Sanchez, P.E. <br />Jean - Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS provided engineering design, preparation of <br />construction documents, permitting assistance, <br />and pre- construction phase support services to <br />the City of Hialeah for the reconstruction of over <br />26 miles of existing roadways, including the <br />preparation of designs for the construction of <br />drainage improvements associated with the <br />roadway reconstruction. Our work included <br />meeting with City of Hialeah staff and local <br />regulatory agencies to establish design guidelines, <br />conduct a utility search and identification of <br />existing utilities, existing traffic controls, and <br />review roadway design standards. We also <br />designed and prepared the construction <br />documents for the project. This work included the <br />preparation of summary of quantities, signage <br />and marking plans, signage and marking <br />quantities, MOT plan, specifications, and <br />engineer's estimate of probable construction cost. <br />SRS also performed pre- construction support <br />services, which included attending pre -bid <br />meeting, responding to pre -bid request of <br />information, and review of bids. This also included <br />providing supplemental information and /or <br />clarification of construction documents to <br />prospective bidders during the bid solicitation <br />process, review bid submittals, attend bid - <br />opening meeting, and provide construction <br />inspections as needed. (SRS was Prime <br />Consultant) <br />WE,7_91' 4 <br />INEERIN0,1N0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.