My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2012 10:22:41 AM
Creation date
5/22/2012 10:18:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />PROJECT NAME: A.D. Barnes Park <br />New Walkways and <br />Parking Lot <br />CLIENT'S NAME: Miami -Dade County <br />Park & Recreation <br />Department <br />Mr. Pedro Nunez <br />TYPE OF FACILITY Linear Park with <br />OR SERVICES: Walkways and Parking <br />Lot. <br />SRS PROJECT FEE: $16,813 <br />COMPLETION DATE: January 2007 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Jean- Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS provided the engineering design, permitting <br />and construction phase services of a walkway and <br />bike path and parking lot. The project is located <br />within A.D. Barnes Park along the Coral Gables <br />Canal. The work included the geometric design of <br />the walkways /bike paths and parking lot, design <br />site paving, grading, and drainage plans. <br />Coordinating the work of subconsultants including <br />Surveyors, Geotechnical, electrical site lighting <br />and Landscaping. Our scope of work also included <br />preparing and submitting permit applications and <br />construction plans for "dry -run" and "final" review <br />by local regulatory agencies including Miami -Dade <br />County Building Department, Miami -Dade Public <br />Works Dept., and DERM. <br />Construction Phase services included weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing periodic <br />construction observations, and preparing close- <br />out documents. <br />0EW"N10_"31NEER1NG,1NC. 0-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.