My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2012 10:22:41 AM
Creation date
5/22/2012 10:18:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />-_ 1 <br />PROJECT NAME: City of Hialeah <br />Fleet Fueling Station <br />CLIENT'S NAME: City of Hialeah <br />Mr. Jorge Guanchez <br />(305) 687 -2660 <br />TYPE OF FACILITY Fueling Station <br />OR SERVICES: <br />SRS PROJECT FEE: $73,408.43 <br />COMPLETION DATE: February 2008 to <br />December 2009 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Oliverio Sanchez, P.E. <br />PROJECT DESCRIPTION: <br />SRS services included the preparation of <br />several conceptual site plan layouts for <br />approval by the City. Preparation of <br />construction documents for construction of a <br />new fleet fueling station including replacing <br />existing asphalt and concrete pavements, <br />drainage systems, new fuel management <br />systems, new video security systems, new <br />electrical, fueling pumps, dispensers, <br />underground fuel lines and appurtances, <br />attendant's booth with power, A/C and data, <br />replacement of existing underground fuel <br />tank, and replacing the existing canopy. <br />Other services included contracting and <br />coordinating all topographical surveys and <br />geotechnical investigations; and all <br />permitting including City of Hialeah Building <br />Department, DERM, and FIRE. <br />Construction Phase services included attending <br />construction meetings, reviewing shop <br />drawings, responding to RFI's, providing <br />periodic construction observations, and <br />preparing close -out documents. <br />(SRS was Prime Consultant) <br />:v <br />EN131NEERING,INC <br />a dip <br />:v <br />EN131NEERING,INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.