Laserfiche WebLink
www.bermelloajamil.com <br />EDUCATION <br />Master of Architecture, <br />University of Florida, 1993 <br />Bachelor of Architecture, <br />University of Florida, 1986 <br />Professional Design Experience <br />Mr. Ferrer has over 20 years experience in architecture and interior architecture for a variety of <br />clients, including government facilities, offi ces, parks, and hospitality facilities. He has served as <br />project manager and project architect, coordinating project teams and engineering consultants <br />from project inception through implementation. One of Mr. Ferrer’s primary responsibilities is to ensure <br />that all projects developed at B&A go through our rigorous document review and coordination <br />process. He, along with his team of professionals, reviews all projects for completion, correctness and <br />compliance with established design criteria and governing codes. <br />PROJECT EXPERIENCE <br />Miami International Airport, MIA Mover Automated People Mover, Miami, Florida - As the Design <br />Review Coordinator for the Construction Services Team (FFCST), Mr. Ferrer leads a team of architects <br />and engineers performing design reviews of the design-build team’s documents of the fi xed facilities <br />design of this $259 million project which includes the People Mover Station, Guideway and Traction <br />Power Sub-Station currently under construction. As the Owner’s representatives, Mr. Ferrer and his <br />team reviewed all design and construction documentation including Architectural, MEP, Structural, <br />Civil and Landscape Architecture drawings, RFIs, calculations, schedule, pay applications, waivers, <br />and change orders. <br />Florida Department of Transportation (FDOT) District 4, Amtrak Station Historic Rehabilitation, Fort <br />Lauderdale, Florida - QA/QC. Performed quality control services associated with the Rehabilitation/ <br />Repair/Restoration of the Historic Ft. Lauderdale Amtrak Train Station in Broward County. <br />Miami-Dade Expressway Authority SR836, SR874 and SR112 ORT/DMS Gantries, Miami Florida – B&A <br />Project Manager and Designer responsible for the development of preliminary designs for the <br />proposed ORT and DMS gantries throughout the SR836, SR874 and SR112 corridors. This includes the <br />redesign/replacement of the award-winning existing Wing toll plaza on SR836 with a new signature <br />gateway gantry spanning both East and Westbound lanes and exit ramp to 17th avenue. Numerous <br />signature designs were also generated for mainline and ramp gantries throughout the corridors <br />incorporating the proposed ORT and DMS systems. <br />Miami-Dade Expressway Authority (MDX) SR 836, East Bound Toll Plaza Design Consultant Services, <br />Miami, Florida - Project Manager responsible for all phases of this project, from initial conceptual <br />design through construction phase. This award-winning facility is located on an existing expressway <br />and includes two AVI lanes, six toll lanes, a canopy, a service tunnel and a catwalk. Stainless steel and <br />aluminum cladding provided MDX with the advantages of off-site prefabrication, rapid construction <br />and installation and minimum disruption for the public during this construction process. <br />Miami-Dade Expressway Authority (MDX) Headquarters, Miami, Florida - Project Manager responsible <br />for all phases of this project, from initial conceptual design through construction phase. This award- <br />winning 14,000 SF building was designed to house a state-of-the-art traffi c center, a boardroom and <br />general offi ce space. The existing one-story building was modifi ed to create a gateway into the new <br />building and operated uninterrupted during construction. <br />Miami-Dade Water And Sewer Department Headquarters Facility, Miami, Florida - Project Manager <br />responsible for all phases of this project, from initial conceptual design through construction phase. <br />B&A served as Design Criteria Professional for the $30 million headquarters facility comprised of a-5 <br />story offi ce building and a 10-story parking garage. Responsibilities included consolidating numerous <br />department divisions that were spread throughout the county. <br />Miami-Dade Water And Sewer Department LeJeune Offi ce Building, Coral Gables, Florida - <br />Project Manager responsible for programming, space planning, construction documents, and <br />construction administration services for 58,000 SF building. Responsibilities include coordination <br />Jorge Ferrer <br />Director of Quality Control, Partner <br />47