|
with existing departmental standards, phasing of departments for renovation and analysis of ADA
<br />compliance of existing building.
<br />Miami-Dade Water And Sewer Department Alexander Orr Maintenance Building, Miami, Florida -
<br />Project Manager for remodeling of three-story, 3,600-sf maintenance building. Responsibilities
<br />include programming, space planning, production and coordination of construction documents
<br />and construction administration services.
<br />Miami-Dade Water And Sewer Department Salzedo Offi ce Building, Coral Gables, Florida - Project
<br />Manager for remodeling of a three-story, 36,000 SF building. Responsible for programming, space
<br />planning, production and coordination of construction documents and construction administration
<br />services. Also responsible for coordination with existing departmental standards, phasing of
<br />departments for renovation and analysis of ADA compliance of existing building. $1,000,000 furniture
<br />(systems and case goods) budget.
<br />Miami-Dade Water And Sewer Department Southwest Customer Service Building, Kendall, Florida -
<br />Project Manager for new 3-story, 95,000 SF building. Responsible for programming, space planning,
<br />interior design and production and coordination of construction documents. $2.5 million furniture
<br />(systems and case goods) budget.
<br /> Marriott Vacation Club International Architectural Due Diligence Analysis, Miami, Florida - Prepared
<br />a due diligence analysis in an effort to attract international and domestic timeshare owners for a
<br />proposed 240-unit, 7 building complex at the Marriott Vacation Club Timeshare Resort along the
<br />Greg Norman “Great White Course,” at the Doral Golf Resort and Spa in Doral, Miami-Dade County.
<br />Analyzed regulatory process, focusing on zoning, platting, concurrence, and impact fees. Developed
<br />general architectural concept including drawings, site plans and preliminary specifi cations.
<br />Marriott Vacation Club International Villas at Doral, Miami, Florida - Prepared design and
<br />construction documents for 240 unit, 7 building multi-phase project at the Doral Golf Resort and
<br />Spa. Scope included programming, production and coordination of construction documents and
<br />construction administration services.
<br />American Airlines, Admirals Club Concourse D, Miami International Airport, Miami, Florida - Renovated
<br />an existing Admirals Club while minimizing the impact on 2,000 daily passengers. Capacity for 289 club
<br />members combined a dynamic interior with the comfort level club members have come to demand.
<br />American Airlines Admirals Club Mexico City, Mexico - Project Manager responsible for all phases of
<br />this award winning project, from initial conceptual design through construction phase. Intended for
<br />business travelers and international passengers, the Admirals Club in Mexico City combines upscale
<br />fi nishes with practical amenities expected by all visitors.
<br />Salvadore Park and Tennis Center Improvements, Coral Gables, Florida - Provided programming, park
<br />master planning, schematic design and construction documentation for this tennis center and public
<br />park located in Coral Gables, Florida. The facility has 13 tennis courts including eight clay courts and
<br />fi ve hard/asphalt courts and a tennis center that houses restrooms, showers and a tennis pro-shop. In
<br />addition, the park features a picnic pavilion, playground, tot lot, picnic area and street furniture.
<br />Athalie Range Park Improvements, Miami, Florida - Provided architectural and engineering services
<br />for the development of construction documents, bid/negotiations and construction administration.
<br />The project scope included the remodeling of the existing pool facility, including offi ce, bathrooms,
<br />pool and pool equipment. Construction cost - $1.5 million.
<br />Riverside Center, Miami, Florida - B&A assisted the City of Miami in remodeling an existing 10-story,
<br />199,000 SF offi ce building to consolidate all the city’s scattered administrative functions. Operating
<br />www.bermelloajamil.com
<br />Jorge Ferrer
<br />Director of Quality Control, Partner
<br />48
|